Library Service Literature
Product Section Refrigeration
Product Rotary liquid Chillers – Air-Cooled
Model RTAA
Literature Type Installation, Operation, Maintenance
Sequence 3
Date December 1991
File No. SV-RF-RLC-RTAA-IOM-3-1291
Supersedes
Installation RTAA-IOM-3
Operation
Maintenance
Since The Trane Company has a policy of continuous product improvement, it reserves the right to change
specifications and design without notice. The installation and servicing of the equipment referred in this booklet
should be done by qualified, experienced technicians.
Air-Cooled
Series R
®
Rotary Liquid
Chillers
“CO” and Later Design Sequence
Packaged Air-Cooled Chiller,
RTAA 130-400
Remote Evaporator Air-Cooled Chiller,
RTAA 130-200
Models
RTAA-130 RTAA-170 RTAA-240 RTAA-340
RTAA-140 RTAA-185 RTAA-270 RTAA-370
RTAA-155 RTAA-200 RTAA-300 RTAA-400
Part No. X39560468-01

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane RTAA-155 and is the answer not in the manual?

Trane RTAA-155 Specifications

General IconGeneral
ModelRTAA-155
Cooling Capacity155 tons
Voltage460V
Phase3
TypeAir-Cooled Chiller

Summary

General Information

Inspection Checklist

Checklist to protect against transit damage and verify unit condition.

Warnings and Cautions

Installation Responsibilities

Outlines contractor duties for proper unit installation.

Nameplates

Mechanical Installation: Packaged and Remote Evaporator Units

Pre-installation

Steps to take before starting installation, including reporting damage.

Foundation

Requirements for a rigid, level mounting pad or concrete foundation.

Clearances

Specifies space needed around the unit for service access.

Unit Isolation and Leveling

Evaporator Water Piping

Procedures for flushing and connecting the evaporator water piping.

Evaporator Piping

Entering Chilled Water Piping

Details requirements for connecting the chilled water inlet piping.

Leaving Chilled Water Piping

Details requirements for connecting the chilled water outlet piping.

Water Treatment

Freeze Protection

Measures to protect the unit and piping from freezing.

Mechanical Installation: Remote Evaporator Refrigerant Piping

System Configuration

Discusses how system configuration affects line sizing and charges.

Line Sizing

Liquid Line Sizing

Procedures for sizing the liquid refrigerant line based on capacity and length.

Piping Installation Procedures

Leak Test and Evacuation

Refrigerant Charge Determination

Method to determine the correct refrigerant charge required for the system.

Oil Charge Determination

Calculation for the amount of additional oil needed based on refrigerant added.

Installation - Electrical

General Recommendations

General guidelines for electrical wiring and safety precautions.

Installer-Supplied Components

Interconnecting Wiring

External Circuit Lockout

External Chilled Water Setpoint (CWS) Inputs

External Current Limit Setpoint (CLS) Inputs

Installation Check List

Unit Piping

Procedures for flushing and connecting unit water piping.

Electrical Wiring

Connecting power supply, control, and auxiliary wiring to the unit.

Pre-Start Checkout

Unit Voltage Power Supply

Unit Voltage Imbalance

Importance of maintaining voltage balance to prevent motor damage.

Unit Voltage Phasing

Water System

Start-Up Procedures

General

Step-by-step guide to start the unit after pre-start checks.

System Superheat

Procedure for measuring and adjusting system superheat.

System Subcooling

Procedure for measuring and adjusting system subcooling.