EasyManua.ls Logo

Trane RTAA-125 User Manual

Trane RTAA-125
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
September 2005 RTAA-SVX01A-EN
© American Standard Inc. 2005
Models RTAA
RTAA-70
RTAA-80
RTAA-90
RTAA-100
RTAA-110
RTAA-125
Installation
Operation
Maintenance
Series R
®
Air-Cooled Rotary Liquid Chillers
Packaged Air-Cooled Chiller,
RTAA 70-125
Remote Evaporator
Air-Cooled Chiller,
RTAA 70-125

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane RTAA-125 and is the answer not in the manual?

Trane RTAA-125 Specifications

General IconGeneral
ModelRTAA-125
Voltage460V
Cooling Capacity125 tons
Power Supply460V/3/60
Sound Level78 dBA

Summary

General Information

Unit Identification and Specifications

Details on unit nameplates, serial numbers, electrical requirements, and operating charges.

Model Number Coding System

Explanation of the alphanumeric code representing unit features and specifications.

Installation — Mechanical

Site Preparation and Clearances

Guidelines for foundation, location, and required clearances for unit installation.

Rigging and Unit Isolation

Instructions for safely lifting and mounting units to minimize vibration.

Evaporator Water Piping

Details on connecting and installing evaporator water piping, including components.

Installation — Remote Evaporator

Refrigerant Piping and Line Sizing

Guidance on system configuration, piping, and selecting appropriate line sizes.

Leak Testing and Refrigerant Charging

Procedures for leak testing, evacuation, and adding refrigerant and oil to the system.

Installation — Electrical

Power Supply and Wiring

Requirements for sizing and installing power supply and interconnecting wiring.

Control Wiring and Setpoints

Instructions for low voltage wiring, external setpoints, and communication links.

Operating Principles

Refrigeration Cycle and Components

Explanation of the RTAA unit's refrigeration system and its basic components.

Compressor and Oil System Operations

Details on compressor mechanics, oil flow, and system operation.

Controls Interface

Clear Language Display Operation

Overview of the Clear Language Display, keypad functions, and report/setting groups.

Operational Parameters and Setpoints

Description of key operational features like water temperature control and setpoints.

Pre-Start Checkout

Electrical and Water System Verification

Pre-start checks for voltage, phasing, water flow rates, and pressure drop.

Start-Up Procedures

System Charge Verification

Steps to verify system superheat and subcooling after initial operation.

Unit Shutdown Procedures

Shutdown and Restart Process

Procedures for temporary and extended unit shutdowns and subsequent restarts.

Maintenance

Periodic and Annual Maintenance

Routine maintenance schedules including weekly, monthly, and annual tasks.

Component Specific Maintenance

Detailed maintenance for coils, evaporators, and oil systems.

Refrigerant Handling

Charging, Recovery, and Repairs

Procedures for refrigerant side repairs, charging, and recovery.

Pump Package

Pump Installation and Start-up

Guidelines for pump package installation, checkout, and system start-up.

Unit Wiring Diagrams

Schematics and Field Wiring

Reference to electrical schematics and field wiring diagrams for unit connections.

Related product manuals