EasyManua.ls Logo

Trane RuptureGuard CDHF - Page 21

Trane RuptureGuard CDHF
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CTV-SVX06J-EN
21
Carbon rupture disk and gaskets removed and
discarded.
Proper adapters utilized with proper sealant
(Loctite® 242 or Loctite® 277) or welded.
Excess flow valve installed horizontally; refer to
figures in “Overview,” p. 7.
Pressure gauge installed; refer to figures in
“Overview,” p. 7.
Pressure switch installed (when selected); refer to
figures in “Overview,” p. 7.
Purge discharge line connected to the downstream
side piping to vent purge exhaust out the vent line
to the outdoors and no u-traps created in this line.
Drip leg and drain present.
Pressure test RuptureGuard installation using 5
psig (34.5 kPaG) dry nitrogen.
Chiller nitrogen holding charge applied (5 psig [34.5
kPaG]).
IInnssttaallllaattiioonn

Related product manuals