EasyManua.ls Logo

Trane TAM4A0A18S11ED - Refrigerant Line Brazing; Braze The Refrigerant Lines

Trane TAM4A0A18S11ED
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
STEP 1 - Remove Heater, Coil, and Line Set panels.
(See Section 2.2 Panel Removal)
Section 11. Refrigerant Line Brazing
11.1 Braze The Refrigerant Lines
STEP 4 - Connect, but do not braze, field line set to
indoor coil.
Allow a minimum of 1.5 inches of refrigerant line
set before using an elbow coupling.
Important: Service access to the auxiliary heater
must remain unobstructed.
Important: Do NOT unseal coil refrigerant connec-
tion stubs until ready to make connections.
STEP 2 - Remove the sealing plug from the indoor
coil suction (vapor) line.
STEP 3 - Remove the sealing plug from the indoor
coil liquid connection.
Caution: This coil is pressurized with 8-12 psig of dry
air. Do not stand directly in front of the the coil connec-
tions when removing sealing plugs.
Heater
Panel
Line Set
Panel
Coil
Panel
1.5” MIN
1
2
3

Related product manuals