EasyManua.ls Logo

Trane Thermo King T-590 Series - Crate Breakdown Procedures

Trane Thermo King T-590 Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TK 56700-1-IM-EN
11
Crate Breakdown Procedures
Follow these steps after unit has been removed from crate:
1. Remove mounting posts by rotating twist-lock handle to UUPP position, then pulling straight up.
a. Slide each post into retaining channels located on crate base.
b. Rotate twist-lock handle to secure posts to channels.
NNoottee:: Mounting posts mmuusstt be secured to retaining channels for shipment.
2. Fold down front and rear supports by sliding locking rings UUPP until they rest on tab, then fold each support member
down flat.
3. Crate is now ready to return.
Figure 1. Returnable Create Components Shown
RCS1098-2
1
2
3
4
5
9
7
6
8
1. Rear Support Member 6. Locking Rings (X4)
2. Mounting Posts (X2) 7. Twist Locks (X2)
3. Retaining Channels (X2) 8. Mounting Post Secured to Retaining Channels
4. Front Support Member 9. Crate Shown Ready to Return
5.
Forklift Pockets (X2)
RReettuurrnnaabbllee SStteeeell CCrraattee IInnffoorrmmaattiioonn

Related product manuals