Applying Power
• Double check to ensure all wiring is correct
• Measure line voltage to be applied to the input side of the
VLT unit (terminals L1, L2 and L3) to verify it is within +/-
10% of the rated input voltage
• Ensure fuses are correct and in place
• Ensure all run and speed commands are off or at zero
• Power is ready to be switched on