EasyManua.ls Logo

Trevi 106 - BOTTOM DRAIN ASSEMBLY; Dig Holes and Trenches; Assemble Bottom Drain; Position and Secure Drain

Trevi 106
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
When selecting the site of your pool, take into account
city by-laws regarding fences and utilities laws pertain-
i
ng to electrical cables, as well as the landscaping
which you plan to do once the pool is installed.
D
rive a stake into the ground at the center of the site.
Using a measuring tape, draw a circle 15 cm to 20 cm (6"
to 8") longer in radius than the pool, depending on the
w
idth of the uprights (See Illustration 1.1). Remove all
grass from the area which you have just outlined.
Make sure you order the necessary quantities of sand and
s
tone dust (See Chart).
Dear Customer
Congratulations! You have purchased a pool of superior quality and durability. To achieve the best
possible results, follow the instructions carefully. Failure to follow the installation procedures may
result in damage to your pool or property and void your warranty. We recommend that you make a
preliminary study of the instructions booklet to familiarize yourself with the different parts of your
pool. Make sure that you understand each step thoroughly before you begin assembly.
We wish you a most pleasant and refreshing summer.
W
ARNING: Be sure you have read and understood the “Safety Information”
s
heets before you begin your pool installation.
WARNING: For your safety, your pool is not designed for diving and/or jumping
head first. Please do not dive. Diving may result in permanent injury
or death.
SITE PREPARATION
1
SITE LEVELLING
2
ASSEMBLY INSTRUCTIONS
R
OUND POOLS
T
revi 106 / Trevi 186 / Trevi 206/
Trevi 217 / Trevi 218
9
.14 m (30’)
4.77 m (15’ 8’’)
9.54 m (31’ 4’’)
* If you use only sand, add stone dust tonnage to sand.
Chart
Illustration 1.1
Level the edge of the circle, from the turf removal line up
to 30 cm (12”) within the circle.
To do this, use a carpenter’s level set on a large straight
beam, a rope or optical level.
Carefully pack the soil using a tamper tool or vibrating
plate (See Illustrations 2.1 and 2.2), especially on those
areas where a lot of soil was added.
It is also highly recommended to firm up the edge by
adding a 2 cm (3/4”) layer of stone dust (or sand).
The center of the circle can then be excavated to the
desired depth (optional), not to exceed 15 cm (6”) for a
standard liner (See Illustration 2.3).
Remove any stone, piece of wood or other debris from
within the circle. Flatten any protrusion and pack soil tight-
ly. Spread area with salt to prevent roots from growing
back and to eliminate earthworms, which are two causes
of post-installation cracking.
Also spread ant repellant, another cause of post-installa-
tion cracking. Cover with a thin 2 cm (3/4”) layer of com-
pacting sand in order to protect the liner.
Make sure you place a sufficient quantity of sand for the
base finishing inside the circle (See Step 6)
27’- 0’ DIAM. Flat: 3’- 6’
30’- 0’ DIAM. Flat: 3’- 6’
Illustration 2.3

Related product manuals