page -15
Vertically outlet
80/125
Cód. CGAS000231
Black tile
80/125
Cód. CGAS000074
45º elbow
80/125
Cód. CGAS000183
90º elbow
80/125
Cód. CGAS000182
1m coaxial duct
80/125
Cód. CGAS000184
Black tile
80/125
Cód. CGAS000075
Examples of installation:
L 10 mts. (TRO Evolution 20 System)
L 7 mts. (TRO Evolution 30 System)
6.- FILLING THE INSTALLATION
To fill the installation, it should be provided with a fill valve, which can be used to fill the
installation until a pressure of 1,5 - 1.5 bars appears on the “boiler pressure” setting on the
display. The circuit should be filled slowly and with the automatic air bleed valve cap (4) loose,
to let the air out of the installation. The air should also be bled from the rest of the installation
using the air bleed valves provided. When the installation has been filled, close the fill valve.