Do you have a question about the Trianco Contractor H.E. 50/90 EXTERNAL and is the answer not in the manual?
General safety information, COSHH regulations, and handling of materials.
Steps to start and operate the boiler for the first time.
Instructions on how to safely shut down the boiler.
How the burner indicates and can be reset from a lockout condition.
Step-by-step guide on how to report a fault with the appliance.
Procedures to follow when the appliance experiences a fault or breakdown.
Diagram illustrating the boiler's electrical connections and components.
Requirements for the oil storage tank, including size and location.
Step-by-step guide for assembling and fitting the flue system.
Detailed steps for commissioning the boiler correctly.
Specific steps for performing annual boiler servicing.
Possible causes and actions for the burner failing to start.
Causes and solutions when the flame is not properly established.
Reasons and fixes for the burner locking out shortly after ignition.
Reasons for combustion fumes smell and how to address them.