EasyManua.ls Logo

Trianco Greenflame User Manual

Trianco Greenflame
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Greenflame Wood Pellet Boiler 15kW
1
Greenflame Indoor & Outdoor Wood
Pellet Boiler 15kW
Installation, Operation and Servicing Instructions
PLEASE NOTE:
This product MUST be commissioned by a Trianco representative.
Please contact Trianco to arrange the commission immediately after install.
Please read these instructions carefully before installing
and operating this appliance.
TO BE RETAINED BY THE HOUSEHOLDER
Question and Answer IconNeed help?

Do you have a question about the Trianco Greenflame and is the answer not in the manual?

Trianco Greenflame Specifications

General IconGeneral
BrandTrianco
ModelGreenflame
CategoryBoiler
LanguageEnglish

Summary

1. Introduction

2. Warnings and Guarantee / Warranty Information

2.2 Safety Instructions

Safety instructions for installation, operation, and maintenance of the appliance.

2.3 Operating Warnings

2.4 Guarantee and Warranty Information

2.5 Limitations

2.6 Exclusions

3. Pre-Installation Considerations

3.1 Pellets

Details on wood pellet characteristics, quality standards like ENplus-A1, and storage.

3.2 Considerations for Installation

3.3 Operating Area

Requirements for the installation location, air intake, and clearances.

3.4 Connection of the Flue

Guidance on flue pipe connection, draught conditions, and material.

3.5 Operating Problems Caused by Draught Defects in the Flue

3.6 Plumbing Connection

Installation and Assembly

Unpacking

Procedure for unpacking the boiler and checking components against a checklist.

Preparing the Base

Guidance on preparing the plinth for boiler installation, including clearances.

Electrical Connections

4.4 Boiler Control Panel Schematic

4.5 Water Connections

5. Control System

5.1 Error Codes

List and explanation of error codes displayed by the boiler.

6. Boiler Operation & Maintenance

6.1 Turning the Boiler ON/OFF

Instructions for turning the boiler on and off using the control panel or an external timer.

6.2 Emptying the Ash Pan

Procedure for safely emptying the primary and secondary ash pans.

6.3 Filling with Fuel

7. Boiler Handling

8. Technical Data

10. Maintenance Schedule

Full Service

Detailed steps for a comprehensive system service, performed by a qualified engineer.

Heat Exchanger Clean

Procedure for cleaning the heat exchanger and associated components.

Emptying of Ash Containers and Clean Down of Boiler Surfaces

Routine tasks for ash removal and cleaning boiler surfaces.

Related product manuals