10133-12
4. ASSEMBLY STEPS
STEP 7
Rotate Upper Cable (59) as shown.
• InstallPulley1(50)tounitusingone3/8”x2”
HexBolt(64),two3/8”Washers(77)and
one3/8”Locknut(73).
• InstallPulley2(50)tounitusingone3/8”x2-
5/8”HexBolt(65),two3/8”Washers(77),
twoBushings(87)andone3/8”Locknut
(73).
• InstallBIGPulley4(51)tounitusingone
3/8”x2”HexBolt(64),two3/8”Washers
(77)andone3/8”Locknut(73).
• AttachNutEndofTo p CabletoWeight
Selection Rod (30) using Washer (79)
(T3.0xØ13xØ32)andWasher(81)
(T3.0xØ46xØ26).
• InstallPulley3(50)toDoublePulley
Bracket(26)usingone3/8”x2”HexBolt
(64), two 3/8” Washers (77) and one 3/8”
Locknut(73).
• AttachLatBar(22)totheballendofup
perCable(59)usingtwoHooks(49)and
one Chain (Long) (53).
STEP 8
RotateButteryCable(61)asshown.
• AttachSinglePulleyBracket(24)to
VerticalPost(3)usingoneM8x60mm
HexBolt(90),twoM8Washers(76)and
oneM8Locknut(91).
• AttachbothEndsofButteryCable(61)
toLeft&RightAdjustablePlate(15&16)using
one3/8”x1-3/8”HexBolt(63),
two3/8”Washers(77)andone3/8”
Locknut(73).
• InstallPulley1(50)toSinglePulley
Bracket(24)usingone3/8”x2”HexBolt
(64), two 3/8” Washers (77) and one 3/8”
Locknut(73).
• InstallPulley2(50)toIntersectPulley
Bracket(25)usingone3/8”x2”HexBolt(64),
two3/8”Washers(77)andone3/8”Locknut
(73).
• InstallPulley3(50)toSinglePulleyBracket
(24)usingone3/8”x2”HexBolt(64),two3/8”
Washers(77)andone3/8”Locknut(73).