Electrical installation
Electrical installation may only performed by an authorized electrician.
The steam generator power supply line comes directly from the electrical distribution board. In this line it is an advantage to install a
circuit breaker to be able to temporarily switch off the steam generator during servicing. The circuit breaker may be switched off no
sooner than 90 minutes after completed use of the steam room.
Means for disconnection must be incorporated in the fi xed wiring in accordance with the wiring rules.
The connections diagram in Fig. 11 shows the connections for both the ”Commercial” and ”Home” type steam generators. Up to 3 ste-
am generators can be connected to the same control panel. More about this can be found in the section ”Multisteam”.
Fig. 11