EasyManua.ls Logo

U-Line Refrigerator/Ice-Maker Combos - Installation; Site Preparation for Installation

U-Line Refrigerator/Ice-Maker Combos
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
INSTALLATION
SITE PREPARATION
1. Position the unit on a flat, level surface, capable of supporting the
entire weight of the unit. Remember that the unit will be signifi-
cantly heavier once it is fully loaded.
2. Connect the unit to a grounded and polarized 115 VAC, 60Hz,
15A circuit (normal household current).
ELECTROCUTION HAZARD!
Electrical Grounding Required. This appliance
is equipped with a three prong (grounding)
polarized plug for your protection against
possible shock hazards.
NEVER remove the round grounding prong from the plug.
•NEVER use a two-prong grounding adapter.
•NEVER use an extension cord to connect power to the
unit.
Where a two-prong wall receptacle is encountered or a
longer power cord is required, contact a qualified electrician
to have it replaced in accordance with applicable electrical
codes.
DANGER
! !
Users Manual 41923 9/2/03 3:44 PM Page 5

Related product manuals