EasyManuals Logo
Home>UNI-T>Test Equipment>UT90C

UNI-T UT90C User Manual

UNI-T UT90C
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
Rules For Safe Operation (1)
To avoid possible electric shock or personal
injury, and to avoid possible damage to the Meter or
to the equipment under test, adhere to the following
rules:
l Before using the Meter inspect the case. Do
not use the Meter if it is damaged or the case
(or part of the case) is removed. Look for cracks
or missing plastic. Pay attention to the insulation
around the connectors.
l Inspect the test leads for damaged insulation
or exposed metal. Check the test leads for
continuity. Replace damaged test leads with
identical model number or electrical specifications
before using the Meter.
l When using the test leads, keep your fingers
l Do not apply more than the rated voltage, as
marked on the Meter, between the terminals or
between any terminal and grounding.
l When the Meter working at an effective voltage
over 60V in DC or 30V in AC, special care should
be taken from there is danger of electric shock.
l Use the proper terminals, function, and range
for your measurements.
l The rotary switch should be placed in the right
position and no any changeover of range shall
be made during measurement is conducted to
prevent damage of the Meter.
l Disconnect circuit power and discharge all high
-voltage capacitors before testing current,
resistance, diodes, continuity or capacitance.
l Start charging as soon as the power indicator
appears. With a low battery, the Meter might
Model UT90C: OPERATING MANUAL
6

Other manuals for UNI-T UT90C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the UNI-T UT90C and is the answer not in the manual?

UNI-T UT90C Specifications

General IconGeneral
BrandUNI-T
ModelUT90C
CategoryTest Equipment
LanguageEnglish

Related product manuals