EasyManua.ls Logo

UTICA BOILERS MAC-205 - User Manual

UTICA BOILERS MAC-205
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Manufactured by:
ECR International Inc.
2201 Dwyer Avenue, Utica, NY 13501
Tel. 800 325 5479
www.ecrinternational.com
MAH-100
MAC-115
MAH-125
MAC-150
MAH-165
MAC-205
CONDENSING
WALL MOUNTED
GAS FIRED BOILER

Table of Contents

Other manuals for UTICA BOILERS MAC-205

Questions and Answers

Summary

IMPORTANT SAFETY INFORMATION

1. Become familiar with symbols identifying potential hazards.

Introduction to safety symbols like DANGER, WARNING, and CAUTION used throughout the manual.

3. Installation shall conform to requirements of authority having jurisdiction or in absence of such requirements:

Lists US and Canadian codes (NFPA 54, NEC, CSA) that installation must comply with.

1 - IMPORTANT INFORMATION

1. Safety Information

Boiler installation shall be completed by qualified agency. See glossary for additional information.

4 - LOCATING BOILER

4.2 Clearances

Specifies required clearances to combustible materials and for service access from various directions.

4.3 Wall Mounting

Provides step-by-step instructions and diagrams for securely mounting the boiler to a wall.

5 - COMBUSTION AIR AND VENT PIPING

5.4 Approved Venting Materials

Lists recommended and prohibited venting materials, emphasizing polypropylene and specific standards.

6 - HYDRONIC PIPING

6.3 Safety Relief Valve and Air Vent

Details the proper installation and discharge piping for the safety relief valve and air vent.

7 - GAS SUPPLY PIPING

7.1 General

Covers general requirements for gas piping, including materials, sizing, and installation compliance.

7.3 Leak Check Gas Piping

Details the procedure for leak testing gas connections before boiler operation using detectors or fluid.

8 - ELECTRICAL CONNECTIONS

8.1 General

Outlines general electrical requirements, including grounding, power supply, and isolation for safety.

8.3 Electrical Connections

Details wiring requirements, including power supply, grounding, and circuit isolation for boiler and controls.

9 - START UP PROCEDURE

9.3 System Start Up

Outlines the initial steps for starting up the system, including filling and flushing the boiler.

9.4 Fill Condensate Trap with Water

Explains the importance and procedure for filling the condensate trap before boiler operation.

9.7 Commissioning For The First Time:

Details the initial commissioning procedure, including de-aeration and gas type identification.

9.8 Automatic Calibration Function

Explains the automatic calibration process for ensuring proper combustion and performance.

9.9 Manual Calibration Function:

Describes how to perform manual calibration for adjusting CO2 values at different power levels.

9.15 Parameter Settings

Explains how to program boiler electronic board parameters and lists factory settings for various models.

11 - GENERAL MAINTENANCE AND CLEANING

11.2 Maintenance And Routine Servicing

Covers annual checks for peak efficiency, including gaskets, electrodes, and vent systems.

13 - TROUBLE SHOOTING

13.1 Error Messages and Resetting the Boiler

Lists error codes, their descriptions, and corresponding operations for troubleshooting boiler faults.

13.1 Error Messages and Resetting the Boiler - continued

Continues the list of error codes, their meanings, and troubleshooting steps, including anomalies.

UTICA BOILERS MAC-205 Specifications

General IconGeneral
BrandUTICA BOILERS
ModelMAC-205
CategoryBoiler
LanguageEnglish

Related product manuals