18
4 Mounting
VEGADIF 85 • Modbus and Levelmaster protocol
53571-EN-230814
Note:
Nomountingbracketisrequiredforvalveblocksthatcanbeange-
mounted on both sides. The process side of the valve block is
mounteddirectlytoaDPowelement,e.g.anoriceplate.
A:
A
2 2
1
4
7
3 5
6
Fig. 11: Connection of a 5-fold valve block
1 Process tting
2 Process tting
3 Inlet valve
4 Breather valve
5 Inlet valve
6 Valve for checking/ventilating
7 Valve for checking/ventilating
4.5 Measurement setups
4.5.1 Overview
The following sections show common measurement setups:
•
Level
•
Flow
•
Dierentialpressure
•
Interface
•
Density
Dependingontheapplication,theremayalsobedierentarrange-
ments.
Note:
Forsimplication,theeectivepressurelinesarepartlyshownwith
a horizontal course and sharp angles. For wiring, please observe the
instructions in chapter " Mounting, Connection to the process" as well
5-fold valve block