EasyManua.ls Logo

Veit SG67 - Page 35

Veit SG67
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 Adjusting the steam volume
Turning the handwheel adjusts the steam volume.
VEIT recommends to open the handwheel by 90°.
2 Control panel
n Standard version
Ä
Chapter 7.1.1 ‘Control
panel on standard version’ on page 36
n Cleaning version
Ä
Chapter 7.1.2 ‘Control
panel on cleaning version’ on page 37
3 Filling nozzle for VEIT SteamClean
VEIT SteamClean can be refilled via the filling
nozzle, if required.
For cleaning version only.
4 Steam pressure (pressure gauge)
Displays the current boiler pressure.
5 Water filling opening
Feedwater can be refilled via the water filling
opening.
6 Blow-down valve
When opening the blow-down valve, the blow-down
water is discharged during blow-down.
7 Vent valve
If the pump does not supply water, the vent valve
must be opened to vent the pump.
Operation
Controls and indicators
30.09.2022
Steam generator VEIT SG67
35

Related product manuals