9
© 2023 Veolia. All Rights Reserved. Sievers TOC-R3 Analyzer Installation Guide DQS 95000-01 EN Rev. A
*Sievers is a trademark of Veolia and may be registered in one or more countries.
Table 3. Shipping List
Item Name Qty. Image
1 Sievers TOC-R3 1 --
2 Furnace Sleeve* 1
3 Furnace Cartridge* 1
4 Ceramic Balls Set* 1
5
Furnace Cartridge Support
Plate*
1
6
Furnace Head Cover* with
attached Furnace Head
Compression Fitting [10]
1
7
Isoplan High Temperature
Gasket (50x20x2) (Small
Inner Diameter/ID)
1
8
Isoplan High Temperature
Gasket (50x38x2) (Large
Inner Diameter/ID)
1
9
Furnace Head Z-Bracket
(straight edge)
3
10
Furnace Head
Compression Fitting
1
(This
hardware comes pre-
installed on the Furnace
Head Cover [6])
1
11 Furnace Head O-Ring 1
1 Furnace Head Compression Fitting [10] arrives attached to the
Furnace Head Cover [6]. Take care to not lose any pieces!
* Important! These parts are very fragile. Use caution when
handling.
** Optional hardware accessories.
Item Name Qty. Image
12 Furnace Foot Assembly* 1
13
Furnace Foot Z-Bracket
(curved edge)
3
14
Injection Block
Compression Fitting
1
15 Injection Needle 1
16 Ceramic Disk* 1
17 Knurled Thumb Screw 6
18
Waste Tube; PVC (OD 14,
ID 10)
1
** Air Box **
**
Air Scrubber; (Comes with
two mounting brackets.)
Activated Carbon.
[Ships with the Air Box]
**
**
Communication Box
**
**
Particulate Sampler
**