EasyManua.ls Logo

Vertiv Liebert PSA5 - UPS Start-up and Shut-down Procedures

Vertiv Liebert PSA5
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.7 Normal Start-up
With the UPS connected to AC input, press-and-hold the power button for 1 second.
A long tone and 2 short beeps sound while the UPS is in battery self-test mode for a few
seconds. After a successful self-test, the outlets are on.
3.8 Normal Shut-down
1. Press-and-hold the power button for 1 second.
The outlets are turned off.
2. Disconnect AC-input power.
3. Remove the battery cover and disconnect the battery connector.
3.9 Full Shut-down
1. Press-and-hold the power button for 1 second.
The outlets are turned off.
2. Disconnect AC-input power.
3. Remove the battery cover and disconnect the battery connector.
The unit is fully shut down.
Vertiv | Liebert® PSA5™ Installer/User Guide | 15

Related product manuals