Vertiv™ NetSure™ Control Unit (NCU) Controller 2nd Ethernet Port Add-On Kit Installation Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
[ ] 2. Orient the IB4 board over the mounting standoffs, as shown in Figure 1.2. Secure the IB4 board to the standoffs with the
kit provided screws.
[ ] 3. Orient the IB4 board cover over the IB4 board, as shown in Figure 1.2. Secure the IB4 board cover to the distribution
cabinet with the kit provided screws. The screws are installed from the top of the cabinet and secured to the captive
fastener located on the IB4 board cover.
[ ] 4. Attach the provided IB4 board cable to the IB4 board. Route the cable along existing cables to the back of the control
module assembly. Plug the cable into the appropriate connector located on the back of the control module assembly.
See Figure 1.1 and Figure 1.2.
[ ] 5. Re-boot the NCU controller by pressing ENT and ESC at the same time from the front panel. Do this with the Main
Screen being displayed.