30
Vertiv I VRC Self-Contained System I User Manual
4.3 Installation Inspection
After the electrical installation is completed, perform the installation inspection listed in Table 4-2.
After confirming the above items, you can start the commissioning of the VRC unit.
Table 4-2 Installation inspection
Items
Results
The power supply voltage meets the rated voltage on the unit nameplate
The system electric loop has no open circuit or short circuit
There must be no open-circuit or short-circuit in the electrical connections.
The power cable and grounding cable to the air-break switch are connected.
The ratings of the Miniature Circuit Breaker and fuses are correct (Refer to unit nameplate to
select suitable Miniature Circuit Breaker or fuses)
The control cables are tightly connected.
All the cables connections are fastened appropriately, with no loose screws at the
connections