19
Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Filling the DHW cylinder...................................................................................................... 20
• •
2. Shutting down the system
• • •
3. Checking the safety valve function
• •
4. Checking the anode earth current with an anode tester.................................................. 20
• •
5. Cleaning the inside of the DHW cylinder........................................................................... 21
• •
6. Checking and replacing the protective magnesium anode.............................................. 21
• • •
7. Commissioning the DHW cylinder...................................................................................... 22
• • •
8. Checking the connections on the water side for tightness
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6150608