7
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Operating principles....................................................... 8
•
2. Filling the DHW cylinder................................................ 8
• •
3. Inspection and maintenance......................................... 9
• •
4. Shutting down the system
• •
5. Checking the function of safety valves
• •
6. Testing the anode earth current with an anode tester 9
• •
7. Cleaning the inside of the DHW cylinder...................... 9
• •
8. Checking and replacing the magnesium anode (if
required).......................................................................... 12
• •
9. Restarting the DHW cylinder......................................... 13
• •
10. Checking connections on the water side for tightness
•
11. Replacing the Vitosolic 100/solar control module....... 13
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5773 800 GB