Commissioning steps
Inspection steps
Maintenance steps Page
! ! !
• • • 22. Checking all connections on the primary side for
leaks
• • • 23. Checking the burner (recording values on page
108 of the commissioning report)
• • • 24. Checking the function of all safety valves
• • • 25. Checking the tightness of electrical connections
• 26. Matching the control unit to the heating system . . . . . .
24
• 27. Integrating the control unit into the LON system. . . . . .
30
• 28. Implementing a user check (in conjunction with
the LON system)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
31
• 29. Adjusting heating curves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32
• 30. Instructing the system user . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36
• 31. Scanning and resetting the "Maintenance" display
36
Steps – initial start-up, inspection and . . . (cont.)
6
Initial start-up, inspection, maintenance
5692 536 GB