23
Contents
Previous
Page
First
Page
Next
Page
Previous
View
Section 5
Repair
Contents Para
General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Disassembly
Platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Tilt mechanism. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Balance mechanism. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Pan mechanism . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Mechanism housing assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Assembly
Mechanism housing assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Pan mechanism . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Tilt mechanism. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
Balance mechanism. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
General
1 This section details procedures for disassembly and assembly of the Vision 5LF head, where such
operations are not self-evident. Reference is made in the procedures to figures in the Illustrated Parts List.
2 The head is constructed from precision components, many of which are of aluminium alloy. Several of
the assembly procedures require the use of special tools and specific sealants, adhesives or lubricants. It is
advised that only experienced and properly equipped personnel with access to all necessary tools and
materials should attempt to overhaul, repair or replace components on these heads. The tools and
consumable materials required for work on Vision 5LF heads are listed in Section 3.
Disassembly
Platform
3 To remove the platform, proceed as follows (Fig 6.2):
3.1 Remove the platform slide (Section 2).
3.2 Remove two screws (8) and two screws (23), noting that screws are secured with Loctite.
Carefully lift the LH side of the platform and retain the platform slide release spring (28) which will be
released as the platform is lifted.