11
Insert a T-Joiner (G5) into one end of each of an
Upper Frame Tube (G1), and slide it down.
Repeat for the remaining 3 Upper Frame Tubes.
3
STEP
Use a rubber mallet to insert a
Joiner Tube (G3) into the top of a
Lower Frame Tubes (B1), and insert
a Foot (B5) into the bottom.
Repeat for the remaining 3 Lower
Frame Tubes.
WARNING: Ensure that you align these parts correctly. Once inserted, they will be very difficult to remove or adjust.
4
STEP
G1 G5
B1
B5
G3
B. Join the Step assembly and a Step Tube (B2)
between 2 Lower frame tube assemblies.
B4
B3
B2
5
STEP
A. Connect the Step Attachment (B3) and the
Step (B4) using the Step Bolts & Nuts.
NO CARGO NET? SKIP TO 10