12
7
STEP
B2
6
STEP
Connect 2 upper frame tube assemblies to
the 2 lower frame tube assemblies.
Secure the T-joiner between the 2 bolts on one
of the legs
A.
B.
8
STEP
9
STEP
A.
CARGO NET:
CARGO NET:
CARGO NET:
CARGO NET:
C4
Use the included Rubber Covers to cover the top holes
not used with the Cargo Net.
Slide the Step Tube (B2) through the loops at the
bottom of the Cargo Net and secure them in the holes
in the lower frame tubes. Secure using Locking Bolts &
Washers.
Place a T-Joiner (C4) onto the end of the lower frame
tube assembly.
Repeat this step on 1 other lower frame tube assembly.
Note:
The T-Joiner will rest on the bolt from the previous
step.
Insert 2 Lower Frame Tube assemblies into the Cargo
Net.
FOR CARGO NET INSTALL SKIP TO STEP 11