EasyManua.ls Logo

Wacker Neuson BTS Series

Wacker Neuson BTS Series
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Putting into operation
T00962GB 42
7.6 Starting the engine
ATTENCION:
Observe the SAFETY INSTRUCTIONS under all circumstances!
Start the cut-off saw only after complete assembly and
inspection!
Move at least 3 m (10feet) away from the place where you fuelled
the cut-off saw.
Make sure you have a good footing, and place the cut-off saw on
the ground in such a way that the cutting disc is not touching
anything.
Turn protective hood (3) to optimum position according to cutting
application (see drawing).
Grab handle (2) and move protective hood (3) to any position desired
between stops in either direction..
39
if
necessary
40
3 meters
(10 feet)
41

Related product manuals