EasyManua.ls Logo

Walther Systemtechnik WDV-01 - Page 10

Walther Systemtechnik WDV-01
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev. 1.2
Assembly Instructions Dosing Valves WDV-0x
Page 10 of 34
Walther Systemtechnik GmbH D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de info@walther-2000.de
II Refill lift
3. Once the dosing piston reaches the end position, the dosing piston sensor sends a signal, if
applicable. The volume has been completely dosed.
4. Controlled by the external 5/2-way valve, the air piston is moved back into the basic position.
5. Also the dosing piston will be moved hereby and the dosing chamber is refilled by in-flowing medium.
Both pistons have returned into the basic position.
6. The cycle can start again.

Table of Contents

Related product manuals