EasyManua.ls Logo

Watts AERCO Benchmark OMM-0136 - Page 20

Watts AERCO Benchmark OMM-0136
153 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Benchmark Platinum-Edge [II]: Operation-Service Manual
SECTION 3 - START SEQUENCE
OMM-0137_E • GF-211 12/13/2019 Technical Support (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 20 of 153
Start Sequence
Figure 3-4a: BMK750 & 1000 Blower Proof Switch
Figure 3-4b: BMK1500 6000 Blower Proof Switch
6. Upon completion of the purge cycle, the Controller initiates an ignition cycle and the
following events occur:
a) The Air/Fuel Valve rotates to the low-fire (Ignition) position and closes the ignition switch.
The Dial on the Air/Fuel Valve (Figure 3-5) will read between 25 and 35 to indicate that
the valve is in the low fire position.
b) The Spark Cleaning cycle begins (default duration = 7 sec.) and the Ignition Sequence
screen’s Spark Cleaning indicator (Figure 3-3) turns grey. This cycle turns on the ignition
transformer to produce a spark (with no gas flowing) to remove moisture and carbon
buildup from the spark element. For the duration of this cycle, the Controller displays the
Cleaning Igniter status message.
c) Following the Spark Cleaning cycle, power is applied to the gas Safety Shut-off Valve
(SSOV). When the SSOV indicates the Gas Valve is OPEN (POC) and the Ignition
Sequence screen’s Ignition indicator (Figure 3-3) turns grey.
d) If no spark is present 3 seconds into the ignition trial, the Controller aborts the Ignition
Cycle and shuts down the boiler. Refer to Section 10: Troubleshooting in this guide for
guidance if this occurs.
AIR/FUEL VALVE
OUTLET TO BLOWER
BLOCKED
INLET
SWITCH
BLOWER
PROOF
SWITCH
AIR/FUEL VALVE
INLET FROM GAS
TRAIN

Table of Contents

Related product manuals