EasyManua.ls Logo

Watts Aerco Modulex MLX EXT 1530 - Page 3

Watts Aerco Modulex MLX EXT 1530
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Modulex EXT Commercial Series Boilers User Manual
OMM-0095_0H AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 Page 3 of 144
GF-139 Phone: 800-526-0288 09/15/2017
Natural Gas Piping Sizes ....................................................................................................................... 32 4.9.1.1
Natural Gas Piping Connections .......................................................................................................... 32
4.9.1.2
Natural Gas Supply Pressure Requirements ........................................................................................ 32
4.9.1.3
4.9.2 Propane Gas Connections ....................................................................................................................... 32
Propane Gas Piping Sizes ..................................................................................................................... 32 4.9.2.1
Propane Gas Piping Connections ......................................................................................................... 32
4.9.2.2
Propane Gas Supply Pressure Requirements ....................................................................................... 32
4.9.2.3
4.10 FLOW AND RETURN PIPE CONNECTIONS ........................................................................................................ 33
4.11 PRESSURE RELIEF VALVE .................................................................................................................................. 33
4.12 CSD-1 MANIFOLD ASSEMBLY (SUPPLIED) ........................................................................................................ 34
4.13 DETERMINATION OF PRIMARY BOILER PUMP OR BOILER SYSTEM PUMP ...................................................... 35
4.14 CONDENSATE PIPING AND DRAIN ................................................................................................................... 36
4.15 WATER TREATMENT ........................................................................................................................................ 38
4.16 IMPORTANT INSTALLATION WARNINGS.......................................................................................................... 38
4.16.1 Oxygen Levels in the System Water Warning ....................................................................................... 38
4.16.2 Antifreeze Compatibility Warning ........................................................................................................ 38
4.16.3 Lime Scale and Corrosive Water Damage Warning .............................................................................. 39
4.16.4 Connection to Refrigeration System Warning ...................................................................................... 39
4.17 OPTIONAL AIR INTAKE CONNECTION .............................................................................................................. 39
4.18 FLUE MANIFOLD INSTALLATION ...................................................................................................................... 39
4.19 FLUE EXHAUST PIPING TO VENT ...................................................................................................................... 41
4.20 VENT STARTER PIECES ..................................................................................................................................... 42
4.21 COMBUSTION AIR AND VENTILATION OPENINGS ........................................................................................... 43
4.21.1 Insufficient Ventilation and Combustion Air......................................................................................... 43
4.21.2 Room Air Combustion ........................................................................................................................... 44
4.21.3 Sealed Combustion ............................................................................................................................... 44
4.22 INSTALLATION OF THE EXHAUST AND AIR INTAKE SYSTEM ............................................................................ 45
4.22.1 Important Factors for Terminal Orientation and Location ................................................................... 45
4.22.2 Minimum and Maximum Wall Thickness.............................................................................................. 46
4.23 VENT PIPE SIZING ............................................................................................................................................. 46
4.24 ELECTRICAL CONNECTIONS ............................................................................................................................. 48
4.24.1 Regulations in Force ............................................................................................................................. 48
4.24.2 Mains Electrical Supply Connection (120 V 60 Hz) ............................................................................ 48
4.24.3 Service Relay Requirement ................................................................................................................... 49
4.24.4 Electrical Requirements ........................................................................................................................ 49
4.25 FUNCTIONAL WIRING DIAGRAM ..................................................................................................................... 53
4.26 LADDER DIAGRAMS ......................................................................................................................................... 55
4.27 GENERAL LADDER DIAGRAM ........................................................................................................................... 56
4.28 E8 CONTROLLER AND BCM TERMINAL ASSIGNMENTS .................................................................................... 56
4.29 INSTALLATION EXAMPLES ................................................................................................................................ 59
4.30 STARTING UP: FILLING AND DE-AERATING THE BOILER .................................................................................. 61
4.30.1 Necessary Precautions for Safety ......................................................................................................... 61
4.30.2 Supply Voltage, Gas Pressure, and Water pressure.............................................................................. 61
4.31 FILLING THE SYSTEM ........................................................................................................................................ 61
4.31.1 Necessary Precautions While Filling the System .................................................................................. 61
4.31.2 Filling Locations and Preparation.......................................................................................................... 62
4.32 TESTING THE IGNITION SAFETY SHUT-OFF DEVICE .......................................................................................... 64
4.33 BURNER CALIBRATION ..................................................................................................................................... 65
4.33.1 Installing the Gas Analyzer Probe ......................................................................................................... 65
4.33.2 Maximum Output Calibration ............................................................................................................... 66
4.33.3 Minimum Output Calibration ............................................................................................................... 67
4.33.4 Final Check and Ignition Failure Adjustment Procedure....................................................................... 67
4.34 SWEEPER MODE (MANUAL CONTROL) ............................................................................................................ 70
4.35 HIGH ALTITUDE ADJUSTMENT ......................................................................................................................... 71
4.36 HIGH ALTITUDE CONVERSION LABEL ............................................................................................................... 72
4.37 CONVERSION FROM NATURAL GAS TO PROPANE GAS ................................................................................... 73

Table of Contents

Related product manuals