EasyManua.ls Logo

Watts Aerco Modulex MLX EXT 1530 - Service Relay Requirement; Electrical Requirements

Watts Aerco Modulex MLX EXT 1530
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Modulex EXT Commercial Series Boilers User Manual
CHAPTER 4: Installation Instructions
OMM-0095_0H AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 Page 49 of 144
GF-139 Phone: 800-526-0288 09/15/2017
WARNING!
DANGER OF FATAL ACCIDENT DUE TO ELECTRIC SHOCK!
120 VAC connections
may be present on the external connection board when power is supplied to the boiler.
The electrical connections must be carried out only by a qualified person. Before carrying
out the connections or any other operation on the electrical parts, always switch off and
disconnect the electricity supply and ensure for yourself that it cannot be accidentally
turned on.
4.24.3 Service Relay Requirement
Upstream of the electrical connection, a service relay is required (not supplied) which, when the
additional electrical safety devices (if any) intervene, shuts down the electrical supply to the on-
off fuel valve fitted on the gas supply circuit, but NOT to the boiler, so as to guarantee the
running of the pump and permit the boiler to cool down.
4.24.4 Electrical Requirements
No changes may be made to the wiring of the boiler.
All connections should be designed in accordance with the applicable regulations.
Label all wires prior to disconnection when servicing controls. Wiring errors can cause
improper and dangerous operation.
NOTE:
Verify proper operation of the boiler after all servicing operations.

Table of Contents

Related product manuals