EasyManua.ls Logo

Webasto HL 32 D - Page 47

Webasto HL 32 D
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
9 Wiring
diagrams
,,..--._r~~-
r
IS.I
Ex.
of
an Application in Connection with Aut. Control Diagram
on
Page
40,
HL
24132,
and on Page
42,
Air Top
24132
Connection
electronic
control
unit/fuse
holder/interior
thermostat
(mechanical)/Timer 1522 (24 h)
1 elektronic control unit
2
fuse
holder
3
to
battery(+)
4 ground(-)
5 thermostat (mechanical)
8 Timer
1522
(24 h)
14
not used
15
illumination (terminal
58)
15.
1 for battery switch connected
to
negative voltage. see application example
on
page 48
16
with(+) from terminal (75/15)
to
terminal
9:
continuous operation
with
instant heat
as
long
as
the
ignition
is
turned
on
with(+) from terminal
(30)
to
terminal
9:
continuous operation
with
instant heat
no
positive voltage
at
terminal
9:
heating period 1 hour
Ex.
of
an Application in Connection with Aut.
Control
Diagram
on
Page
40,
HL 24/32, and
on
Page
42,
Air Top
24/32
Connection
electronic
control
unit/
fuse
holder/
interior
thermostat
(electronic)/ Timer 1522 (24 h)
1 elektronic control unit
2 fuse holder
3
to
battery(+)
4 ground(-)
7 thermostat (electronic)
8 Timer 1522 (24 h)
14
not used
15
illumination (terminal
58)
15.1
for battery switch connected
to
negative voltage,
see
application example
on
page 48
16
with(+) from terminal (75/15)
to
terminal
9:
continuous operation
with
instant heat as long
as
the ignition
is
turned
on
with(+) from terminal (30)
to
terminal
9:
continuous operation
with
instant heat
no
positive voltage
at
terminal
9:
healing period 1 hour
www.butlertechnik.com
www.butlertechnik.com

Related product manuals