24
WeCo Srl Italy www.wecobatteries.com 4K4LT V1.00 24/01/2023
Always install cables in accordance with installation guidelines and do not use particularly long cables to avoid excessive
voltage drops
After all cables and bar buses have been connected and the inverter has been set correctly, place the rocker switches (see section 5.4) of all
batteries on ON (I). Try to start the system by turning on only the master module: if the installation is set correctly all modules will turn on in
sequence.
Reassemble the protective front plate to protect the power and communication terminals.