INSTALL BAR BUS AND RS-485 RJ45 COMMUNICATION CABLE
To allow cables or bus bars to pass from one battery to another, the front protection highlighted below must be removed.
MAKE SURE THAT THERE IS ZERO VOLTAGE ON THE BATTERY TERMINALS. CHECK THE LED BUTTON AT THE BOTTOM AND ALWAYS MEASURE
THE B+ AND B- TERMINALS WITH A MULTIMETER.
Once you have verified that there is ZERO-volt present ON ALL BATTERIES, proceed with the installation of cables or bar buses (as
shown in the example below).
EXAMPLE of connection to the power supply through the STACKABLE BAR BUS KIT and cluster composed of 2 TOWERS 4 + 4)
<
INSTALL BUS BAR MODEL
4K4LT (Accessory not
included) ON THE TERMINAL
LV BLOCK
or properly prepared cables