EasyManua.ls Logo

Weider Pro 8900 - Page 14

Weider Pro 8900
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16. Attach the Top Frame (6) to the Weight Guides
(31) with two M10 x 43mm Bolts (65), two M10
Curved Washers (86), and two M10 Locknuts
(74).
See step 15. Tighten the M10 Locknuts (74).
16
65
74
1
65
31
17. Note: For clarity, the Top Cover (27) is not
shown.
Route the Burn Cable (45) over two Burn
Pulleys (68).
Attach each Burn Pulley (68) to the right side of
the Top Frame (6) with an M10 x 40mm Bolt
(97) and an M10 Locknut (74).
17
74
14

Other manuals for Weider Pro 8900

Related product manuals