EasyManua.ls Logo

WeiderPro Pro 4300 - Page 21

WeiderPro Pro 4300
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
37. Wrap the Leg Lever Cable (51) under a 90mm
Pulley (48). Attach the Pulley to the Right Press
Arm (16) with an M10 x 50mm Bolt (97), two Half
G
uards (55), a Cable Trap (56), an M10 Washer
(80), and an M10 Locknut (77). Make sure that
the Cable Trap and Half Guards are oriented
as shown.
38. Wrap the Leg Lever Cable (51) around a V-pulley
(47). Attach the Pulley to the Upright (2) with an
M10 x 70mm Bolt (113), two Half Guards (55), an
M10 Washer (80), a Long Cable Trap (57), and
an M10 Locknut (77). Make sure that the Cable
Trap and Half Guards are oriented as shown.
39. Wrap the Leg Lever Cable (51) around a 90mm
Pulley (48). Attach the Pulley to the Left Press
Arm (15) with an M10 x 50mm Bolt (97), two Half
Guards (55), an M10 Washer (80), and a Cable
Trap (56). Make sure that the Cable Trap and
Half Guards are oriented as shown.
37
38
47
80
55
77
2
55
51
113
57
9
7
55
56
48
77
80
5
5
1
6
51
39
55
56
55
77
15
48
51
80
97

Related product manuals