EasyManua.ls Logo

Weil-McLain EcoTec 80 - Page 13

Weil-McLain EcoTec 80
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part number 550-100-260/0520
13
ECO
®
Tec GAS-FIRED WATER BOILER – 80/110/150/199 BOILER MANUAL
1 Boiler Out (Supply) connection, (male, 1" NPT )
1a Air Elimination/Relief Valve Connection Water Pipe, (male, 3/4" NPT) use for relief vale and air elimination.
2 Boiler In (Return) connection, (male, 1" NPT ).
3 Boiler relief valve, shipped loose with boiler — $/./4MOUNTRELIEFVALVEUNTIL!&4%2HYDROSTATICTESTING.
3a 4%-0/2!2),9/.,9 Install a ¾" NPT cap in the Air Elimination/Relief Valve Connection Water Pipe.
4HIS-534"%2%-/6%$AFTERTHETESTANDTHERELIEFVALVEMOUNTEDHERE.
4 Pressure/temperature gauge, shipped loose with boiler.
5a Reducing tee, NPT, 1 " x 1 " x ¼" on 80/110, & 1 ¼" x 1 ¼" x ¼" on 150/199, shipped loose with boiler.
5b Reducing tee, NPT, 1 " x 1 " x ¾" on 80/110, & 1 ¼" x 1 ¼" x ¾" on 150/199, shipped loose with boiler.
7 Bushing, NPT, 1 ¼" x 1", shipped loose with boiler (150/199 only).
8 Nipple, NPT 1" x close on 80/110, & 1 ¼" x close on 150/199, by installer .
9 Isolation valve on supply connection, by installer (1" NPT on 80/110, 1¼" NPT on 150/199).
10 Isolation valve on return connection, by installer (1" NPT on 80/110, 1¼" NPT on 150/199).
11 ¾" NPT boiler drain valve, shipped loose with boiler — after hydrostatic testing, move drain valve to lowest point on the return piping if not
already there.
12 Auto air vent, by installer.
13 Bushing, NPT 3/4", by installer.
14 Tee, NPT 3/4" x 3/4" x 3/4", shipped loose with boiler.
15 Street elbow, NPT 3/4" x 3/4", shipped loose with boiler.
Boiler hydrostatic test (continued)
&IGURE Install pipe fi ttings for relief valve and
pressure/temperature gauge —
$/./4
MOUNTRELIEFVALVEUNTIL!&4%2HYDROSTATIC
TESTING
(see legend below)
&IGURE Install piping components required for
hydrostatic test (see legend below)
(&27HF
Boiler In
Boiler Out
1
4
5a
Recommended but
not included
3a
2
11
1a
(&27HFD
(150/199 only)
Recommended but
not included
8
8
11
9
10
7
7
(150/199 only)
5b
(&27HF
1a
3
15
14
12
13
Recommended piping after
hydrostatic test

Table of Contents