EasyManuals Logo

Weil-McLain EcoTec 80 User Manual

Weil-McLain EcoTec 80
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
Part number 550-100-260/0520
14
ECO
ยฎ
Tec GAS-FIRED WATER BOILER โ€“ 80/110/150/199 BOILER MANUAL
Gas conversions
Prepare boiler for propane โ€”
ECO
Tec 80/110/150/199
(if required)
Propane operation
!,,๎˜€๎˜€BOILERS๎˜€MUST๎˜€BE๎˜€CONVERTED๎˜€FOR๎˜€
PROPANE๎˜€OPERATION
.
#ONVERTING๎˜€AN๎˜€EXISTING๎˜€NATURAL๎˜€GAS๎˜lRED๎˜€
BOILER๎˜€FOR๎˜€PROPANE
โ€” For a boiler already
installed, you must turn off gas supply, turn
off power and allow boiler to cool before
proceeding. You must also completely test
the boiler after conversion to adjust gas valve
to proper setting, verify performance, and
start up the boiler following instructions
beginning on page 102 of this manual.
6ERIFY๎˜€ PROPANE๎˜€ GAS๎˜€ VENTURIโ€” See
Figure 10, page 15 LP gas venturi will have a
black label and will be clearly labeled โ€œLPโ€.
Must change control settings to proper gas
type.
Failure to comply could result in severe
personal injury, death or substantial property
damage.
This conversion kit shall be installed by a
quali๏ฌed service agency in accordance with the
manufacturerโ€™s instructions and all applicable
codes and requirements of the authority
having jurisdiction. If the information in these
instructions are not followed exactly, a ๏ฌre, an
explosion or production of carbon monoxide
may result causing property damage, personal
injury or loss of life. The quali๏ฌed service agency
is responsible for the proper installation of this
kit. The installation is not proper and complete
until the operation of the converted appliance
is checked as specified in the manufacturerโ€™s
instructions.
Natural Gas to Lique๏ฌed Petroleum (Propane)
conversion kits
ECO
Tec๎˜€๎˜˜๎˜๎˜๎˜‘๎˜‘๎˜๎˜€,0๎˜€P/N 510-811-415 NG to Propane Gas Conversion Kit contents:
511-050-233 ๎˜‚๎˜ƒ๎˜„๎˜…๎˜†๎˜‡๎˜ˆ๎˜‰๎˜Š๎˜‰๎˜‹๎˜ˆ๎˜Œ๎˜†๎˜ƒ๎˜๎˜ƒ๎˜Ž๎˜‰๎˜๎˜ƒ๎˜…๎˜‡๎˜๎˜‘๎˜ƒ๎˜†๎˜’๎˜‰๎˜“๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜–๎˜‰๎˜—๎˜•๎˜˜ 1
562-150-304 ๎˜™๎˜š๎˜‡๎˜ƒ๎˜›๎˜‰๎˜๎˜•๎˜„๎˜‰๎˜œ๎˜Ž๎˜๎˜‰๎˜ž๎˜Ÿ๎˜ก๎˜‰๎˜ข๎˜ฃ๎˜Š๎˜๎˜ค๎˜ฅ๎˜ฆ๎˜Ÿ๎˜’๎˜’๎˜‰๎˜›๎˜ง๎˜™๎˜Œ๎˜๎˜‰๎˜จ๎˜๎˜„๎˜๎˜‰๎˜‹๎˜๎˜š๎˜ฉ๎˜‰๎˜ช๎˜•๎˜˜๎˜ซ๎˜ƒ๎˜‡ 3
๎˜ฌ๎˜ฎ๎˜Ÿ๎˜Š๎˜Ÿ๎˜ฃ๎˜ท๎˜Š๎˜ค๎˜ค๎˜ฎ ๎˜ช๎˜•๎˜˜๎˜ซ๎˜ƒ๎˜‡๎˜‰๎˜๎˜ฎ๎˜ฃ๎˜‰๎˜น๎˜๎˜ป๎˜๎˜‰๎˜ฅ๎˜‰๎˜๎˜ผ๎˜ฝ๎˜‰๎˜พ๎˜๎˜ป๎˜๎˜‰๎˜—๎˜•๎˜‡๎˜‘๎˜๎˜š๎˜ฉ 1
๎˜ฌ๎˜ผ๎˜ก๎˜Š๎˜ฝ๎˜ฆ๎˜ท๎˜Š๎˜ฆ๎˜ฝ๎˜ฎ ๎˜พ๎˜Š๎˜ฟ๎˜ˆ๎˜„๎™€๎˜‰๎˜ฝ๎˜๎˜ฌ๎˜ฝ๎˜’๎˜’๎˜‰๎˜ฅ๎˜‰๎˜ฎ๎˜ฝ๎˜๎˜ฌ๎˜ก๎˜‰๎˜น๎˜๎˜ป๎˜๎˜‰๎˜’๎˜’๎˜‰๎™๎˜‘๎˜•๎˜š๎˜ฉ 1
๎˜ฌ๎˜ผ๎˜ก๎˜Š๎˜ฝ๎˜ฆ๎˜ท๎˜Š๎˜ก๎˜ฆ๎˜ท ๎˜—๎˜•๎˜˜๎˜ฉ๎˜ƒ๎˜…๎˜‰๎˜Ÿ๎˜Š๎˜‹๎˜ˆ๎˜”๎˜˜๎˜‰๎™‚๎˜๎˜ป๎˜ข๎˜‰๎˜ฟ๎˜ˆ๎˜„๎™€๎˜‰๎˜ฌ๎˜ก๎˜‰๎˜ป๎˜ˆ๎˜•๎˜๎˜‰๎˜’๎˜’ 1
550-225-336 ๎˜‹๎˜•๎™„๎˜ƒ๎˜‘๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„ 1
๎˜ฌ๎˜ฎ๎˜ก๎˜Š๎˜ฌ๎˜Ÿ๎˜ผ๎˜Š๎˜ฆ๎˜ฝ๎˜ผ ๎˜พ๎˜‡๎˜ˆ๎˜๎˜š๎˜ƒ๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜‹๎˜ˆ๎˜Œ๎˜†๎˜ƒ๎˜๎˜ƒ๎˜Ž๎˜‰๎˜๎˜ƒ๎˜…๎˜‡๎˜๎˜‘๎˜ƒ๎˜†๎˜’๎˜‰๎˜“๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜–๎˜‰๎˜ท๎˜ก๎˜ง๎˜ฆ๎˜ฆ๎˜ก๎˜‰๎™‚๎˜จ๎˜พ๎˜‰๎˜ž๎™‚๎˜จ 1
๎˜ฌ๎˜ฌ๎˜ก๎˜Š๎˜ฆ๎˜ฃ๎˜Ÿ๎˜Š๎˜ผ๎˜ค๎˜ท ๎˜น๎˜„๎˜˜๎˜…๎˜‡๎˜†๎˜š๎˜…๎˜ˆ๎˜๎˜„๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„๎˜‰๎™†๎˜•๎˜…๎˜‰๎˜…๎˜๎˜‰๎˜‹๎˜๎˜‰๎˜—๎˜•๎˜˜๎˜‰ 1
ECO Tec๎˜€๎˜‘๎˜•๎˜๎˜€,0๎˜€P/N 510-811-416 NG to Propane Gas Conversion Kit contents:
511-050-234 ๎˜‚๎˜ƒ๎˜„๎˜…๎˜†๎˜‡๎˜ˆ๎˜‰๎˜Š๎˜‰๎˜‹๎˜ˆ๎˜Œ๎˜†๎˜ƒ๎˜๎˜ƒ๎˜Ž๎˜‰๎˜๎˜ƒ๎˜…๎˜‡๎˜๎˜‘๎˜ƒ๎˜†๎˜’๎˜‰๎˜“๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜–๎˜‰๎˜—๎˜•๎˜˜ 1
562-150-304 ๎˜™๎˜š๎˜‡๎˜ƒ๎˜›๎˜‰๎˜๎˜•๎˜„๎˜‰๎˜œ๎˜Ž๎˜๎˜‰๎˜ž๎˜Ÿ๎˜ก๎˜‰๎˜ข๎˜ฃ๎˜Š๎˜๎˜ค๎˜ฅ๎˜ฆ๎˜Ÿ๎˜’๎˜’๎˜‰๎˜›๎˜ง๎˜™๎˜Œ๎˜๎˜‰๎˜จ๎˜๎˜„๎˜๎˜‰๎˜‹๎˜๎˜š๎˜ฉ๎˜‰๎˜ช๎˜•๎˜˜๎˜ซ๎˜ƒ๎˜‡ 3
๎˜ฌ๎˜ฎ๎˜Ÿ๎˜Š๎˜Ÿ๎˜ฃ๎˜ท๎˜Š๎˜ค๎˜ค๎˜ฎ ๎˜ช๎˜•๎˜˜๎˜ซ๎˜ƒ๎˜‡๎˜‰๎˜๎˜ฎ๎˜ฃ๎˜‰๎˜น๎˜๎˜ป๎˜๎˜‰๎˜ฅ๎˜‰๎˜๎˜ผ๎˜ฝ๎˜‰๎˜พ๎˜๎˜ป๎˜๎˜‰๎˜—๎˜•๎˜‡๎˜‘๎˜๎˜š๎˜ฉ 1
๎˜ฌ๎˜ผ๎˜ก๎˜Š๎˜ฝ๎˜ฆ๎˜ท๎˜Š๎˜ฆ๎˜ฝ๎˜ฎ ๎˜พ๎˜Š๎˜ฟ๎˜ˆ๎˜„๎™€๎˜‰๎˜ฝ๎˜๎˜ฌ๎˜ฝ๎˜’๎˜’๎˜‰๎˜ฅ๎˜‰๎˜ฎ๎˜ฝ๎˜๎˜ฌ๎˜ก๎˜‰๎˜น๎˜๎˜‰๎˜ป๎˜๎˜‰๎˜’๎˜’๎˜‰๎™๎˜‘๎˜•๎˜š๎˜ฉ 1
๎˜ฌ๎˜ผ๎˜ก๎˜Š๎˜ฝ๎˜ฆ๎˜ท๎˜Š๎˜ก๎˜ฆ๎˜ท ๎˜—๎˜•๎˜˜๎˜ฉ๎˜ƒ๎˜…๎˜‰๎˜Ÿ๎˜Š๎˜‹๎˜ˆ๎˜”๎˜˜๎˜‰๎™‚๎˜๎˜ป๎˜ข๎˜‰๎˜ฟ๎˜ˆ๎˜„๎™€๎˜‰๎˜ฌ๎˜ก๎˜‰๎˜ป๎˜ˆ๎˜•๎˜๎˜‰๎˜’๎˜’ 1
550-225-336 ๎˜‹๎˜•๎™„๎˜ƒ๎˜‘๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„ 1
๎˜ฌ๎˜ฎ๎˜ก๎˜Š๎˜ฌ๎˜Ÿ๎˜ผ๎˜Š๎˜ฆ๎˜ฃ๎˜ก
๎˜พ๎˜‡๎˜ˆ๎˜๎˜š๎˜ƒ๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜‹๎˜ˆ๎˜Œ๎˜†๎˜ƒ๎˜๎˜ƒ๎˜Ž๎˜‰๎˜๎˜ƒ๎˜…๎˜‡๎˜๎˜‘๎˜ƒ๎˜†๎˜’๎˜‰๎˜“๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜–๎˜‰๎˜ฆ๎˜ฌ๎˜ก๎˜ง๎˜ฆ๎˜ผ๎˜ผ๎˜‰๎™‚๎˜จ๎˜พ๎˜‰๎˜ž๎™‚๎˜จ
1
๎˜ฌ๎˜ฌ๎˜ก๎˜Š๎˜ฆ๎˜ฃ๎˜Ÿ๎˜Š๎˜ผ๎˜ค๎˜ท ๎˜น๎˜„๎˜˜๎˜…๎˜‡๎˜†๎˜š๎˜…๎˜ˆ๎˜๎˜„๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„๎˜‰๎™†๎˜•๎˜…๎˜‰๎˜…๎˜๎˜‰๎˜‹๎˜๎˜‰๎˜—๎˜•๎˜˜ 1
ECO Tec๎˜€๎˜‘๎˜™๎˜™๎˜€,0๎˜€๎˜๎˜ง๎™†๎˜‰๎˜‰๎˜ฌ๎˜ฆ๎˜ก๎˜Š๎˜ท๎˜ฆ๎˜ฆ๎˜Š๎˜ฃ๎˜ฆ๎˜ค๎˜‰๎™†๎˜—๎˜‰๎˜…๎˜๎˜‰๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„๎˜‰๎™ˆ๎˜ˆ๎˜…๎˜‰๎˜š๎˜๎˜„๎˜…๎˜ƒ๎˜„๎˜…๎˜˜๎™‰
511-050-235 ๎˜‚๎˜ƒ๎˜„๎˜…๎˜†๎˜‡๎˜ˆ๎˜‰๎˜Š๎˜‰๎˜‹๎˜ˆ๎˜Œ๎˜†๎˜ƒ๎˜๎˜ƒ๎˜Ž๎˜‰๎˜๎˜ƒ๎˜…๎˜‡๎˜๎˜‘๎˜ƒ๎˜†๎˜’๎˜‰๎˜“๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜–๎˜‰๎˜—๎˜•๎˜˜๎˜‰ 1
562-150-304 ๎˜™๎˜š๎˜‡๎˜ƒ๎˜›๎˜‰๎˜๎˜•๎˜„๎˜‰๎˜œ๎˜Ž๎˜๎˜‰๎˜ž๎˜Ÿ๎˜ก๎˜‰๎˜ข๎˜ฃ๎˜Š๎˜๎˜ค๎˜ฅ๎˜ฆ๎˜Ÿ๎˜’๎˜’๎˜‰๎˜›๎˜ง๎˜™๎˜Œ๎˜๎˜‰๎˜จ๎˜๎˜„๎˜๎˜‰๎˜‹๎˜๎˜š๎˜ฉ๎˜‰๎˜ช๎˜•๎˜˜๎˜ซ๎˜ƒ๎˜‡ 3
๎˜ฌ๎˜ฎ๎˜Ÿ๎˜Š๎˜Ÿ๎˜ฃ๎˜ท๎˜Š๎˜ค๎˜ค๎˜ฎ ๎˜ช๎˜•๎˜˜๎˜ซ๎˜ƒ๎˜‡๎˜‰๎˜๎˜ฎ๎˜ฃ๎˜‰๎˜น๎˜๎˜ป๎˜๎˜‰๎˜ฅ๎˜‰๎˜๎˜ผ๎˜ฝ๎˜‰๎˜พ๎˜๎˜ป๎˜๎˜‰๎˜—๎˜•๎˜‡๎˜‘๎˜๎˜š๎˜ฉ 1
๎˜ฌ๎˜ผ๎˜ก๎˜Š๎˜ฝ๎˜ฆ๎˜ท๎˜Š๎˜ฆ๎˜ก๎˜Ÿ ๎˜พ๎˜Š๎˜ฟ๎˜ˆ๎˜„๎™€๎˜‰๎˜ฝ๎˜’๎˜’๎˜‰๎˜ฅ๎˜‰๎˜ค๎˜ก๎˜’๎˜’๎˜‰๎™๎˜‘๎˜•๎˜š๎˜ฉ 1
๎˜ฌ๎˜ผ๎˜ก๎˜Š๎˜ฝ๎˜ฆ๎˜ท๎˜Š๎˜ก๎˜ฆ๎˜ท ๎˜—๎˜•๎˜˜๎˜ฉ๎˜ƒ๎˜…๎˜‰๎˜Ÿ๎˜Š๎˜‹๎˜ˆ๎˜”๎˜˜๎˜‰๎™‚๎˜๎˜ป๎˜ข๎˜‰๎˜ฟ๎˜ˆ๎˜„๎™€๎˜‰๎˜ฌ๎˜ก๎˜‰๎˜ป๎˜ˆ๎˜•๎˜๎˜‰๎˜’๎˜’ 1
550-225-336 ๎˜‹๎˜•๎™„๎˜ƒ๎˜‘๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„ 1
๎˜ฌ๎˜ฎ๎˜ก๎˜Š๎˜ฌ๎˜Ÿ๎˜ผ๎˜Š๎˜ฆ๎˜ฃ๎˜ก
๎˜พ๎˜‡๎˜ˆ๎˜๎˜š๎˜ƒ๎˜‰๎˜—๎˜•๎˜˜๎˜‰๎˜‹๎˜ˆ๎˜Œ๎˜†๎˜ƒ๎˜๎˜ƒ๎˜Ž๎˜‰๎˜๎˜ƒ๎˜…๎˜‡๎˜๎˜‘๎˜ƒ๎˜†๎˜’๎˜‰๎˜“๎˜๎˜‡๎˜๎˜”๎˜•๎˜„๎˜ƒ๎˜–๎˜‰๎˜ฆ๎˜ฌ๎˜ก๎˜ง๎˜ฆ๎˜ผ๎˜ผ๎˜‰๎™‚๎˜จ๎˜พ๎˜‰๎˜ž๎™‚๎˜จ 1
๎˜ฌ๎˜ฌ๎˜ก๎˜Š๎˜ฆ๎˜ฃ๎˜Ÿ๎˜Š๎˜ผ๎˜ค๎˜ท ๎˜น๎˜„๎˜˜๎˜…๎˜‡๎˜†๎˜š๎˜…๎˜ˆ๎˜๎˜„๎˜˜๎˜‰๎˜จ๎˜๎˜„๎™…๎˜ƒ๎˜‡๎˜˜๎˜ˆ๎˜๎˜„๎˜‰๎™†๎˜•๎˜…๎˜‰๎˜…๎˜๎˜‰๎˜‹๎˜๎˜‰๎˜—๎˜•๎˜˜ 1
s๎˜€ Follow all instructions in proper order.
s๎˜€ Do not tamper with venturi. DO NOT change or modify
venturi in any way.
s๎˜€ Dispose of an uninstalled venturi; do not leave in the
building.
s๎˜€ Caution โ€“ the gas supply shall be shut off prior to
disconnecting the electrical power, before proceeding
with the conversion.
s๎˜€ Whenever the venturi is removed, all gaskets must be
replaced with new gaskets.
0IPE๎˜€SIZING๎˜€FOR๎˜€PROPANE๎˜€GAS
Contact gas supplier to size pipes, tanks and 100% lockup gas
pressure regulator.
.ATURAL๎˜€AND๎˜€0ROPANE๎˜€SUPPLY๎˜€PRESSURE
1. Adjust propane supply regulator provided by gas supplier
between the pressure listed below:
2. Pressure required at gas valve inlet pressure port:
a. Maximum: 14โ€ (356 mm) w.c. with no ๏ฌ‚ow (lockup).
b. Minimum gas pressure, with gas flowing (verify during
boiler startup, while boiler is at high ๏ฌre): 3ยฝโ€ (89 mm) w.c.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Weil-McLain EcoTec 80 and is the answer not in the manual?

Weil-McLain EcoTec 80 Specifications

General IconGeneral
BrandWeil-McLain
ModelEcoTec 80
CategoryBoiler
LanguageEnglish

Related product manuals