INSTALLATION PROCEDURES
To Dispense Cold Water:
Allow at least 30 minutes for adequate cooling, then wave hand over
“Dispense”
To Dispense Hot Water:
Wave hand over “Hot Select”. The dispense light will change from blue to
red. Then wave hand over “Dispense”.
NOTE:
Hot water will require about 30 minutes to properly heat after the tank is full.
Cold water will require about 1 hour to chill.
NOTE:
Check UPC and Local Plumbing Codes to confirm that all connections are in
compliance.