EasyManua.ls Logo

WESCOR 7720 - Page 22

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DOC-00322-ENA.doc Page 22 of 29 ! Wescor, Inc
B. Flush 100 mL prepared SS-029C through the line. Block flow at nozzle holder with a gloved finger for
a few seconds during flushing. Stop flushing just before 100 mL is gone and allow to soak in line
overnight.
C. Flush prepared SS-029C out of line with 500 mL of DI water.
D. Reinstall Reagent B (Potassium Permangante) and flush 100 mL through the line to remove DI water.
3. Reinstall nozzles. Always return nozzles to the same location in stainer.
4. Perform SPRAY PATTERN and SPRAY VOLUME tests. Record results from end of month SPRAY
VOLUME test on preventive maintenance chart. NOTE: When entering a new month, the Volume After
Monthly Cleaning number becomes Previous Months Ending Volume number.
5. Disinfect reusable bottles with a 1/10 dilution of bleach. Rinse thoroughly with deionized water.
6. Initial completion of monthly PM.
7. Supervisor checks and initials.
ANNUALLY:
1. Check internal and exterior tubing and fittings for cracks, leaks, or any type of deterioration. Replace as
needed.