EasyManua.ls Logo

Wolf CGS-24/200 - Boiler Assembly Steps

Wolf CGS-24/200
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
3044826_201403
Service Manual
- Replace the combustion chamber lid on the combustion
chamber and secure with locking tabs.
Assembly
- Install the combustion chamber pot.
- Push the plug back onto the gas fan.
- Push the plugs back onto the ionisation and the ignition
electrodes.
NB