EasyManua.ls Logo

Worcester GREENSTAR i SYSTEM

Worcester GREENSTAR i SYSTEM
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
SYSTEM PRESSURE
6 720 644 864a (2010/10)
4SYSTEM PRESSURE
4.1 SEALED HEATING SYSTEMS
This boiler is fitted to a sealed heating system which is pre-pressurised. Your installer will advise you
of the minimum and maximum pressure indicated on the pressure gauge.
B Check regularly that the pressure is maintained.
Fig. 6 Optimum pressure when cold (area A)
B Contact your installer or maintenance engineer if a permanent significant decrease in pressure is
indicated on the pressure gauge.
The filling method on the i System boiler will be an external filling loop, with fitted valves and a flexible
hose. The filling loop should ideally be located close enough to the boiler so that the pressure gauge
can be monitored during filling.
6720643356-11.1Wo
2
3
1
04
bar
1
A
Min
1 bar
1.5 bar
Max

Related product manuals