EasyManua.ls Logo

Worcester HEATSLAVE 9.24 RSF

Worcester HEATSLAVE 9.24 RSF
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fig
.
15
Rear flue application.
M4w
ing
boll
v
Flue
duct.
Fl
ue
du
ct
housing
.
cra
mp
ing
ring.
8d. BOILER FLUE
ASSEMBLY
SIDE
100
mm
- 1
000
mm
14
in.
-
39
.3
in.)
1.
Apply
a bead of sil
icone
seal
ant
approximately
6 mm
10.25
in
. l
di
amete
r arouncHhe
outside
of
the
blanking
off
cap and agai
nst
the
wa
ll
mounting
plat
e. See Fig. 6.
2. Lift
the
appliance
onto
1he
wall
m
oun
ting plate. Engage
the
two
supp
ort
ta
bs
into
1
he
slots
in
t
he
back
of
the
appliance casi
ng
. Locete the
three
M6
studs
and blanking
of
f
cap
on
the
wall
mount
i
ng
plate
into
th
e back
of
the
appl
i
ance
casing. F
asten
t
he
a
pp
li
ance
to
the
wa
ll
mounting
plate
with
tl'le t hree
M6
nuts
and
washers
previous
ly
rem
oved.
3. Remove
the
fan
and flue h
ood
asse
mb
ly:
(a~
Disconne
ct
the
elec
tr
ica
l
connec
t
io
n
to
the fan at
th
e plug
in t erminal
st
rip.
{b}
Eas
e the
flexible
tube
f
rom
th
e
left
hand side
of
the fan
ho
using.
(cl Remove theM
5screw
holding t he fan housing
to
th
e boiler
casi
ng
,
ldl
Slrde the
fa
n asse
mbly
o
ut
of
th
e boiler casi
ng
.
{e) Unsc
rew
the
two
M4
wing
nuts
and w&shers.
one
from
each side of the
flue
hood
assemb
ly
. Ease
th
e
flue
hood
assembly
off
the
heat
ex
cha
nger and
out
of
the
bo
iler
casi
ng
.
(f)
Unscr
ew
the
t
wo
M4
ex
tension
wi
ng
b
olts
and rem
ov
e
the
flue
duc
t clamping
ring
from
the tl
ue
duct
ho
usi
ng
.
Retainthetanassemblyand
M5
scre
w.
M4
w in
gnutsand
washers, flue
hoo
d
assembly
,
M4
extensio
n
wing
bo
lt
s
and
cl
amping
ri
ng
. T
ake
care
no1 t o
damage
t
he
c
ompone
n
ts
.
4.
Cut
and measure
the
ai
r duct assem
bly
as
fo
llows
:
NOH:: For
flue
le
ngth
1
00
mm
to
l
000
rnm (4 in. to
39
.3
ln.) u se
ttte standa
rd
flue
assembly
.
An
ext
ens
i
on
flue is
not
requir
ed.
15
(~)
Meas
ure
the
di
stance
L alo
ng
the
horizonta
l
flue
centre
li
ne
from
tl)e
outside
of the appliance
to
the
outsid
e of
the
wa
ll. See
fig.
22
.
The
over
all
le
ngth
of
11
0
mm
(4
. 5 in.)
diam
eter
standard
air du
ct
for
the
instaJiation
will
be L +
34
mm(
L +
l.3i
n.
)
(b) Re
du
ce
the
stan
dard
air
duct
to
the req
uired
leng
th
.
Cut
surplus f rom
pi
!lin end. Do
not
cut
expanded end. See Fig.
16.
icl
Fi
t
the
flue
te
rminal
adaptor
i
nt
o the
ex
panded
end
of
th
e
air
duel. Sl
id
e
the
flue
termi
na
l i
nto
the
air d
uct
up to
th
e
ro
lled s
top
channel. Using
the
holes in
the
ex
panded
en
d
of
the
air
du
ct
as
a guide, drill thr
ough
the
ada
ptor
and fl
ue
te
rm
inal
with
the
3mm
drill supplied.
Se
cure the assembly
togetherwiththetwoNo
. 6 x
10
mmse
lft
appi
ngsc
re
ws
.
See Fig.
17
.
5.
Cut
and ass
emb
le the f
lue
duct
as f
ollows:
(a) Redu
ce
the
60
mm
(2.4
in.} di
am
eter
st
and
ard f
lue
d
uc
t
toth
e required leng
th
.
The
overall l
ength
of
the
s
t!lndard
ll
ue
duct
for
the
installation
will
be L +
260
mm
(L +
10
.
25
in.).
(b)
Cut
th
e
surplus
fr
om
the
p
la
in
e
nd,
do
n
ot
c
ut
the
expanded
end. See Fig. 16.
(c) Slide
the
flue cl
am
pi
ng
ri
ng
or:to
the f lue
duct
and l
oca
te
at
the
expanded e
nd
cfthe
d
uct
w
ith
the
ch
amfer
against
th
e
expanded
end.
Se
e
Fi
g. t 6.
6 .
Ass
em
ble
the
flue duct
Into
t
he
ai
r
duct
and
engage
th
e
end
of the
flu
e duct i
nto
the
fl
ue
terminal. See Fig. 17.
NOTE
:
The
fl
ue
d
uc
t
sh
ould
slide
int
o
the
te
rm
ina
l
approx
imate
ly
100mm
(
4.0i
n.)
. See Fig.
17
.
7. Rearrange
the
fl
ue
duct
hous
i
ng
position
for
si
de
flue
applica
tion. A
ep
l
acethef
lue hood
assembly
. Fit t he fl
ue
assembly
and rep
lace
th
e
tan
as
sem
bly
as
fol
lows:
.
(
a)
Un
sc
rew
the
four
M 5
screws
sec
uring
the
flue
duct
housing o
nt
o
the
flue
ho
od. Rearrange
the
flue
outlet
to
t
he
required si
de
flue p
osi
t
io
n. R
epl
a
ce
the
four
M5
screws
.
(b)
Replace the flue
hoo
d asse
mb
ly.
Ensure
the
t
wo
M4
bo
lt
s
are c
or
rect
ly
l
ocated
and secure
with
the
t
wo
M4
w ing
n
ut
s and
wa
shers
previous
ly
rem
c
ved.
tc) A
pply
a srnear of siticone seal
ant
around the
in
side of
the
air
duc
t
socket
on
th
e si
de
of
the
boiler.
(d) From
the
o
uts
ide, ease the fl
ueassembly
th
ro
vghtheho
le
prepared
in
the
wal
l.
Pa
ss
th
e
flu
e
duct
dampi119 ring
th
ro
ugh
the
air
duct
socket
as
sho
wn
in Fig.
2.3
. Fully
engage
the
air
duc
t i
nt
o the
socket
on
the side of
the
boiler.
T
igh
ten
the
clamp
i
ng
scr
ew
. See Fig. 22.
(e} Assemble
the
flue
duct
to
th
e flue
duct
housing
and
fix
together w
it
h the clampi
ng
ring and
th
e
two
M4
exte
nsi
on
wi
ng
bolts
previ
ously
rem
ov
ed
. See Fig. 15.
lfl
Ma
ke
go
od ex
ternal
bric
k
work
or
wall
rendering. The
i
nside
e
dg
e
of
the
rolled
chann
el fixed
to
the flue
te
rmi
nal
will
pr
ot
r
ud
e approximately l
Omm
(0 .
4in.
)fr
om
the
wall
.
Make
good
in
te
rn
al
b
rick
wo
rk
or
wall
fin
is
h. E
ns
ure t he
flue assem bly is in a horizo
nta
l plai
n.
(
g)
Replace
th
e
fan
as
sembly
and
secure
with
t
he
M4
screw
prev
i
ous
ly r
emoved
.
lhl
Rep!acettte f lexi
bl
e
tub
eto
the
connection
at
the
l
eft
hand
side or
the
fan
ho
using.
(i) Re
co
nnect the elec
tr
ical
co
n
nec
tion
to
the fan
at
t
he
plug-
in terminal
stri
p.
8 . Re
mov
e t he
knock
out
area
in
th
e c
abinet
side
p<
m
el
to
fit
over
the
air
duct
.
Remove
a
ny
sharp ed
ges
.
9 . Replace
the
cabin
et
side panel. Loc
ate
the
bo
tt
om
keybo
le
sl
ot
ove
r
the
M5screw
andtighten. To e
ng
age pa
nelit
wil
l
ne
ed
to
be t il
ted
to
allow
engagement
on
to
the
b
ot
tom
sc
r
ew
.
Screw
theM
5 ca
pti
ve
ex
t
ension
s
cre
w
at
t
he
t
op
ins
ide edge
of
the
side
pane
l t o
the
rear of the appli
ance
.
10
. Fit
theM
5 h
exagon
he
L)ded
scr
ew
pr
evio
usly retai
ned
to
the
fr
ont
inside ed
ge
of
each s
id
e panel a
nd
lo
ca
te
it to
th
e
elec
tr
ic
al
control panel.
11.
Complete
the
remainder
of
the ins
ta
llat
ion
as
deta
iled in
Section
8. paragraph
15
onw
a
rd
s.

Related product manuals