EasyManua.ls Logo

Worcester HEATSLAVE 9.24 RSF

Worcester HEATSLAVE 9.24 RSF
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sa. BOILER FLUE
ASSEMBLY
REAR
100
mm
-1000
mm
!4
in
. -
39.3
in
.)
NOTE: A
flue
extension
ki
t is
not
required .
1.
Measure
and
cu
t
the
air
d
uct
to
length
as
follows:
(a
t Measure
the
wal
l
t
h~ckne
ss
L
and
add
32
mm
(1
.
25
i
n.l
See Fig. 4.
Th
is
!s
the
overall
l
ength
of
llOmm
14.5 in . 1
dia
meter
air
duct
re
quired.
(b)
Reo
ucet
h
eai
rdu
cttothe
le
ngth
required i.e. L +
32mm
I 1 .
25
in.) by cu
tting
the
surplus
from
the plain end. Do
no
t
cul
the
expanded end. S
ee
Fig.
7.
2. Fit
the
flue
te
rm
in
al
adaptor
i
nt
o t he expanded end ot
the
air
duct
. Slide
the
flue
te~minal
i
nto
the
air d
uc
t up
to
t11~
ro
:led
stop
channel.
Usi
ng
th
e
ho
les
in
the
e;~~;par.deo
end
of
the a
ir
duct
as a guide, drill
thro
u
gh
the
adapto
r and f!ue
terminal wi
th
the
3
mm
drill suppiied. Secure
the
assemb
ly
tog
ether
wi
th
the
two
No.6
x 1
Omm
self
tapp
ing
screws
.
See
Fig. 8.
3.
From
the
outside ease
the
air
duct
and termina! assembly
through
the h
ole
pre
pared
in the
wall
. Ensure
the
8ir
duct
engages in
the
hole :n
the
wall
mo:.~
rn
i
n
g
plate
. It
may
be
necessa~y
to
al
ign
the
ho
le
in
the
wai
l
mount
ing plate
with
the
ho
le in the cl
ampin
g pfate
by
ad
ju
s
tin
g
the
two
socket
headed scr
ews
on the t
op
edge
of
the
wall
mount
ing plate.
See Fig. 1
3.
4. From i
ns
i
de
adj
ust
the
air
duct
unt
il it proj
ec
ts
12
mm
!0.5
in
.l from
the
fron
t face
of
the
wall
mounting
pi<Jte
.
See
Fi
g. 13.
5.
Tight en
the
two
screws
on
the
to
o
edge
of
the
wall
mount i
ng
plate
firmly
to
locate
th
e air
duct.
See
Fig.
13
and
14.
Ensure the air
duct
is securely fixed in position and
the
flue
assembly
is in a h
or
izo
nta
l plane.
Make
good
ex
ternal brick
work
or
wa
ll renderi
ng
,
<he
inside edge
of
the
rolled chan
ne
l
fixed
to
the
flue terminal
wi
ll protrude
ap
prox
i
mately
1
Omm
(0.4
in
.)
tromthewall
. See Fi
g.
13
and 14.
6.
Apply
the sili
co
ne sealant in a
bead
approximat
ely
6
mm
(0
. 2 5 in.)
diamete
r
around
o
ut
si
de
of
the
air
duct
and
in
contact
.w ith
the
waU
moun1ing plat
e.
See Fig. 13.
7. l
if1
the
appHance
onto
the
wall
moun
ting plate. Engage
the
two
support
tabs
i
nto
th
e
slot
s
in
the
back
of
the
appli
ance
casing. l oca
te
the t hree M 6 studs and air
duct
on
the
wall
mount
i
ng
plate
int
o the back
of
the
appliance
casing
. Fasten
the
app
lia
nce
to
the
wall
mounting
plate
with
the
three
M6
nuts
and
washers
previ
ou
s
ly
removed.
8 . Remove
the
fan and
fl
ue
ho
od
assembly
.
'a
I Disconnect t he el
ectr
ic
a~
co
nnection
to the
ia
n
atthe
plug
in
terminal
str
ip.
(b)
Ease
the
fleKible
tube
from
the
le
ft
hand side
of
the
fan
ho
u
sing.
{c) Remove th
eM
5sc
r
ew
ho
!ding the fan housing
to
the boiler
casi
ng
.
{
dl
Sli
de
the
fan
assembly
ou
t
of
the boiler casi
ng
.
{e) Uns
cr
ew
the
two
M4
wing
nuts
and
washers
one
from
ea
ch
s~
de
of
the flue
hoo
d
assembly
. Ease the flue hood
assembly
off
the
h
eat
exchanger
a
nd
o
ut
of
the
boiler
casing
.
(f)
Unscrew
the
two
M4
extension
wing
bol
ts
and
remove
th
e
flue
duct
clamping
ring
1rom
the
flue
duct
h
ousing.
9- Retain
the
fan assembly and
M5
screw
,
M4
wing
nu
1s
i;ind
was
h
ers
, f lue
hood
ass
embly
,
M4
e>ete
nsion wi
ng
bolt
s
and
clamp
i
ng
rin
g.
T
ake
ca re
not
to
damage
the
components
.
10.
Reduce
the
60
mm
12.4
in.]
diameter
Hve duct to
the
required
lengt
h
which
is L + 1
20
mm
(4.
75
i
n.
)
NOTE:
Cut
th
e s
urpl
us
from
the
pla
in
end. Do
not
cut
the
flared
end.
See
Fi
g.
7.
1 1 . Fit
the
flu e
du
ct
clamping
ri
ng
and
flue du
ct
a
nd
replace
the f an and flue
hood
a
ssembly
as follows :-
(a) Slide the
tlue
duct cl
amping
ri
ng
onto
the
f
lue
duct
and
·
lo
cate
at the expa
nde
d
end
of
the
duc
t
with
the
chamfe
r
agai
ns
t
the
expan
ded
end. See
Fi
g. 7.
8
lbl
From
i
nside
, slide
the
flue
duct
assemb
ly
into
the air
duct
engag
i
ng
the
end
of
the
flue
d
uct
into
the
flue
term
inal.
See
Fi
gs.
13
and
14.
·
NOTE:
Th
e
flue
d
uct
should
s
lide
int
o t he
te
rm
inal
approximstely
10
0
mm
{
4.0
in .). See Fig. 8.
fc) Replace
the
fl
ue
hood assembly. Ensure the
two
M4
bo~ts
are
co
rrect
ly located
and
secure w ith
the
two
M4 wi
ng
nu
ts a
nd
washers
pre
vio
us
ly
removed
.
fdl
As
semb
le
the
flue
du
ct
to
the
flue
duct
housi
ng
and f
ix
together
w ith the
clamping
ring and
two
M4
extens
ion
wing
bo
lts
prt!v
iously
removed
, See Fig. 13 or
15.
fe) Replace the
fa
n assembly and sccurt: wi1h the
MSs
cr
ew
previously
r
emoved.
li
I
Rep
l
acethaflexi
ble
tu
beto
the
connect
ion
at
the left-hand
side of
the
fan
hous
ing.
tg)
Reconnect
the
electrical
co
nr.ec:tior.
to
the
fan
at
the p!
ug
in
te
rm
in al
str
ip.
12.
Comp
lete
th
e remainder
of
t
he
in
stallation
as
detailed
in
Sectio
n 8 . paragraph 1 5 on
wards
.
8b.
BOILER FLUE
ASSEMBLY
REAR
1001
mm
-
1200m
m
!39.3
i
n.
-
47.2
in
.l
NOTE: F
or
flue l
ength
1001
mmto
1
200
r
nm
t39.4in.
to4
7.2
in
.) use
t
h~
st
a
r,
darci flue
assembl
y and
extens
ion
fl
ue.
1.
Cut
and
assemb
le
the
air
duc
t as
1o
ll
ows
:-
(a)
MMs
u
rP
the
flue
length
la
nd add
32
mm ( 1.
25
in.) See
Fig.
14.
This
is t
he
overall length of 1
10
mm
(4 .5 in.!
diam
eter
air
duct
required.
(b)
Reduce
th
e le
ng
th
of
t
he
standard air
duct
to
900
mm
(35
.5i
n.}. Cut surplus fr
om
plain end. Donotc:
utex
panded
end. See Fig. 9.
(cl Reduce
the
len
gth
of
the
ex
t
ens
ion a
ir
du
ct
by
cu
tt
in
g
from
the end w
it
hout holes
unt
il t
he
required over
aU
l
ength
after
engagement
of the
two
d
uc
ts
is
obtained
. See Fig.
9.
ldl
FuHy
enga9e
the
e;~~;tension
air
duct
i
nto
the
expanded e
nd
of
the
sh
ort
ened standard air
duct
. Ensu re the
o
vcr~ll
lengt
h is
co~rec
t
and the
two
holes in
the
extensi
on
air
duct
are posit
ioned
at
the
e;~~;t
reme
e
nd.
See Fig. 9.
(e)
Us
i
ng
t
he
two
hole
s
in
the
expanded
end as a
gu
ide, drill
two
3
mm
diameter
holes
us
in
g
the
dr
ill
supp
li
ed.
Disengage
the
air
du
ct
s and apply a
smear
ot siticone
seal
ant
around
t he ou
ts
i
de
of
tht:
ext
en
sion
duc
t .
Reassemble and secure
with
the
two
self
·t
apping screws
suppfied . See Fig.
9.
2 . Stide t
ile
flue t erminal
into
the
e)(
tension air
duct
up
to t
ile
ro
lled
sto
p channel.
NOTE:
Th
e flue terminal
adapto
r
is
not
required and
must
be dis
carded.
Using
the
holes
in the eKtension air duct as a
guide
,
dr
ill
throug
h the f
lu
e t
er
mina
l
with
t he 3mm
dril
l su
pp
lied .
Securet
h
eassembly
togethe
t
wi
ththe
tw
o
No
. 6
;~~;
10mm
self
tapping
!>crews. See Fig. l 0 .
3. F
ro
m t
he
outs
i
de
ease the air
du
ct
and
term
inal assem
bl
y
th
ro
ugh t
he
hole
prepared in the
wa
ll. Ensure
the
air
duc
t
engages
in
the
tlole in
th
e
wall
moun
tin
g
plate
. It
may
be
necessary
to
align
the
hoi~
in
th
e
wa
ll
mo
u
nti
ng
plate
with
th
e
hole
in
t
he
c
lamp
i
ng
plate
by
ad
ju
st
ing the t
wo
soc
ket
headed
screws
on
the top
edge of the
wa
ll
mount
ing plate.
See
Fi
g. 13 .
4 .
From
inside,
adj
us
t t
he
air
duct
un
til
it
projects
1 2 mrn
(0 . 5 i
n.)
fr
om
th
e
fr
o
nt
face of
the
wall
mou
n
ti
ng plate.
See F
ig
. 1 3.
5. Ti
ghten
t he
two
screws
on
the
top
edg
e of
the
wall
mounting
plate
firm
ly
to
locate
t he air
du
ct.
See Fig. 13
and
14
. Ensure
th
e air du
ct
is secur
ely
fixed
in
positi
on
and
the
flue
assembly
is in a horizontal plan
e.
Make
go
od
externa
l
br
i
ckwork
or
wall
renderi
ng
,
th
e inside
edge
of
the
rolled
ch
annel fi
xe
d
to
the
flue
te
rminal
wi
ll
protrude
appr
oximatley
1
Omm
(0
.4 in.
)fro
mthe
wall.
See
Fig. 13
a
nd
14.

Related product manuals