EasyManua.ls Logo

XDrum DD 650 - Drum Installation - Part 1

XDrum DD 650
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Snare Installation
1.
Open Snare Stand Legs to suitable
position and make it stand firm.
2.
Open Snare Stand Arms, stretch it to
maximum, put the Snare upward on the stand.
The one with rubber band and white sensor spot
is the upside.
3.
Tighten Snare Stand Arms by rotating
the rotary on the bottom side
HiHat Installation
1.
Open HiHat Stand Legs to suitable position and
make it standfirm.
2.
Insert Thin Rod into screw thread on the Bottom
Stand according to dashed line here, and rotate it
clockwise to fasten it.
3.
Place Hollow Rod outside Rod, and insert it into
Bottom Stand.
4.
Insert HiHat Cymbal Tray onto Thin Rod and place
it aboveHollow Rod
5.
Adjust Hollow Rod to suitable height and fasten
it. Insert HiHat Cymbal onto Thin Rod. Make sure there is
enough space between the Cymbal and Tray, and then
fasten the screw on Cymbal.
Note: If there is not enough space between Cymbal
and Tray, the HiHat control function will be very short in
range or even notresponding.
INSTALLATION
DRUM INSTALLATION - 1

Related product manuals