VESDA by Xtralis VESDA Commissioning Guide
www.xtralis.com 1
Table of Contents
1 Introduction to VESDA Commissioning 3
2 The Commissioning Process 5
3 Pre-Commissioning 7
3.1 Before going to the Site 7
3.2 VESDA Commissioning Form - Prerequisites 7
3.3 Once on Site 7
4 System Configuration and Setting Thresholds 9
4.1 Generic Configuration (VLC, VLS, VLP) 9
4.2 Detector Specific Configuration Steps (VLC, VLS, VLP) 11
4.3 VESDA VFT-15 Detector Configuration 15
4.4 VESDA VLF Configuration 16
4.5 Documenting Configuration and Thresholds 16
5 System Integrity Test 19
5.1 Performance-based Smoke Testing 19
5.2 Testing Relay Function 23
5.3 Testing Devices 23
5.4 Documenting Test Results 23
6 Hand Over 25
Index 27