EasyManua.ls Logo

Yamaha F20BEH - Page 10

Yamaha F20BEH
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-4
UNCRATING PROCEDURE
(FOR TYPICAL STEEL FRAME)
7. Remove the top cowling (6).
8. If the lifting points are covered by the fly-
wheel cover, remove it.
9. Attach a lifting harness (7) securely to the
lifting points (8), and tighten the harness.
For F350/F300, install the lifting attach-
ment (A) to the flywheel using the exclusive
3 bolts (B), insert the eye bolt (C) to the
attachment, attach a lifting harness (D) to
the eye bolt, and tighten the harness.
[Bolt (B) torque: 36 Nm, 3.6 kgf•m, 27 lb•ft]
* F350/F300 lifting eye kit (P/N: 90890-06820)
as special service tool.
Lifting eye kit contents:
10.Remove the skeg holder (9) if it is attached.
(6)
(7)
(8)
(7)
(8)
(A)
(A)
(A)
(D)
(D)
(D)
(B)
(B)
(B)
(C)
(C)
(C)
Eye bolt (C)
Attachment (A)
Eye bolt (C)
Bolt (B)
90890-06821 (3 pcs)
Bolt (B)
90890-06821 (3 pcs)
Attachment (A)
(9)
To be continued.

Table of Contents

Related product manuals