EasyManuals Logo

Yazaki AROACE User Manual

Default Icon
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #2 background imageLoading...
Page #2 background image
2
GENERAL
This equipment should only be
installed by trained and qualified
personnel who are familiar with
absorption chillers. All precautions in
these instructions as well as on tags and
labels attached to the unit must be
observed to ensure the safety of
personnel and to maintain warranty
validation.
Each Yazaki absorption chiller has
been evacuated, charged with lithium
bromide and water solution, and run
tested prior to leaving the factory.
Piping connections are all located at
the rear of the unit.
After the equipment has been
installed, a Yazaki Authorized Service
Provider (ASP) must check the
installation and supervise or conduct the
initial startup and operation of the unit.
CAUTION
THE YAZAKI WARRANTY WILL BE
VOIDED IF THE FOLLOWING
RESTRICTIONS ARE NOT OBSERVED:
1. DO NOT OPEN ANY SERVICE VALVES
WITHOUT A PROPER EVACUATION
ASSEMBLY ATTACHED TO THEM AS SUCH
ACTION WILL RESULT IN LOSS OF
VACUUM AND INTRODUCTION OF GASES
TO THE INTERIOR OF THE MACHINE
WHICH COULD CAUSE CORROSION.
2. ALWAYS HANDLE THE EQUIPMENT WITH
CARE AND MAINTAIN IN A NEAR-
VERTICAL POSITION DURING RIGGING. IF
THE EQUIPMENT MUST BE TILTED,
CAREFULLY FOLLOW INSTRUCTIONS
PROVIDED WITHIN THIS DOCUMENT.
3. DO NOT ATTEMPT TO START THE
SYSTEM WITHOUT SUPERVISION FROM A
YAZAKI AUTHORIZED SERVICE PROVIDER
(ASP).
MODEL DESIGNATION
WFC-S C 5
Water-Fired Chiller
Cooling Only Design
Cooling Capacity: 5 rated tons

Other manuals for Yazaki AROACE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Yazaki AROACE and is the answer not in the manual?

Yazaki AROACE Specifications

General IconGeneral
BrandYazaki
ModelAROACE
CategoryChiller
LanguageEnglish

Related product manuals