EasyManua.ls Logo

Yealink W78P - Assembling the DECT Phone; Connecting Base Station Power and Network; Desktop Installation of Base Stand; Wall-Mount Installation of Base Station

Yealink W78P
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
2a. (Desktop Installation) Attach and remove the base stand.
Attach the Base Stand
Remove the Base Stand
MAC
SN
MAC
SN
MAC
SN
Align the snap-ts with the corresponding
holes and push forward, snapping them
into the holes.
Remove the snap-ts from the
holes horizontally.
2b. (Wall-Mount Installation) Attach the base station.
Assembling the DECT Phone
1. Connect the base station power and the network using method a or
method b.
a. AC Power Option
b. PoE (Power over Ethernet) Option
IEEE 802.3af compliant
PoE Hub/Switch
Note:
If you choose method a, use Yealink supplied power adapter (5V/0.6A). A third-party power adapter may
damage the base station.
If you choose method b, you do not need to connect the power adapter. Make sure the hub/switch is PoE-
compliant.

Related product manuals